Timbermill wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Timbermill wind farm is an operating wind farm in Edenton, Chowan County, North Carolina, United States.
Project Details
Table 1: Phase-level project details for Timbermill wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2024[1] | 189 MW[2] | Onshore[2] | Apex Clean Energy [100%][2] | Apex Clean Energy[3] |
Location
Table 2: Phase-level location details for Timbermill wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Edenton, Chowan County, North Carolina, United States[2] | 36.1617, -76.6035 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.timbermillwind.com/operations_news https://www.timbermillwind.com/about_timbermill, https://www.timbermillwind.com/operations_news.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240125182210/https://www.timbermillwind.com/about_timbermill. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.timbermillwind.com/operations_news.
{{cite web}}
: Missing or empty|title=
(help)