Timken Harrison steel plant
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Timken Harrison steel plant is an electric arc furnace (EAF) idled steel plant in Canton, Ohio, United States.
Location
The map below shows the exact location of the plant in Canton, Ohio, United States:
- Location: 1835 Dueber Ave. SW, Canton, Ohio 44706, United States
- Coordinates (WGS 84): 40.778466, -81.396889 (exact)
Background
The Timken Harrison steel plant began operating in 1916.
In 2006, TimkenSteel was fined $200,000 for air pollution violations between November 2002 and May 2003 and insufficient pollution control equipment.[1]
In 2008, the company invested $60 million into a new rolling-mill, which was complemented with further investments into upgrades in 2011.[2]
In 2015, TimkenSteel was fiend $400,000 for worker safety violations after a worker was injured in an accident.[3] In 2016, TimkenSteel faced a $129,000 fine for worker safety violations after another worker was injured falling from a crane.[4]
In February 2021, TimkenSteel announced it would be indefinitely idling the Harrison steel plant by the end of March 2021 due to effects from the Covid-19 pandemic, a move that would cut around 100 jobs at the plant.[5][6]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Idled date | Workforce size |
---|---|---|---|
Mothballed[7][8] | 1916[9] | 2021[7][8] | 600[10] |
Table 2: Ownership and Parent Company Information
Owner | Owner company PermID | Owner company GEM ID |
---|---|---|
TimkenSteel Corp[11] | 5041076804 | E100000131012 |
Table 3: Process and Products
Steel product category | Steel products | Steel sector end users | ISO 14001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|---|
semi-finished; finished rolled[12] | steel bar, billet, tubing, gears[12][13] | automotive; energy; transport; tools and machinery[14] | 2021[15] | EAF[13] | 2 EAF (began in 1971 and 1976)[13] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
mothballed | 800 TTPA[16][16] | 800 TTPA[16][16] |
Table 5: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | EAF Production | Total (all routes) |
---|---|---|
2020 | 411 TTPA[17] | 411 TTPA |
2021 | 0 TTPA[18] | 0 TTPA |
2022 | 0 TTPA[18] | 0 TTPA |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ "EPA Fines Timken $200,000 For Air Pollution Violations". Manufacturing.net. 2006-07-27. Retrieved 2021-10-30.
- ↑ "Timken Increasing Capacity Across Steel Plants Company". 2011-07-12. Retrieved 2021-10-30.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "OSHA fines TimkenSteel nearly $400K for safety hazards". Atlantic Training Blog. 2015-11-10. Retrieved 2021-10-30.
- ↑ "Worker severely injured in 40-foot fall from crane at TimkenSteel | U.S. Department of Labor". www.dol.gov. 2016-02-01. Retrieved 2021-10-30.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Hlavaty, Kaylyn (2021-02-16). "TimkenSteel idling Harrison plant in Canton, potentially impacting 100 jobs". Cleveland News. Retrieved 2021-10-30.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Pritchard, Edd (2021-02-16). "TimkenSteel to idle some Harrison operations, cuts 100 jobs". Retrieved 2021-10-30.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 7.0 7.1 https://web.archive.org/web/20210216233156/https://www.news5cleveland.com/news/local-news/akron-canton-news/timkensteel-idling-harrison-plant-in-canton-potentially-impacting-100-jobs. Archived from the original on 16 February 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20210416150033/http://investors.timkensteel.com/news/corporate-news/press-release-details/2021/TimkenSteel-Announces-Fourth-Quarter-and-Full-Year-2020-Results/default.aspx. Archived from the original on 16 April 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20201010165139/http://www.timkensteel.com/100. Archived from the original on 10 October 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.timkensteel.com/~/media/Harrison%20Plant.ashx.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220111165841/https://www.timkensteel.com/buy-from-us/our-locations. Archived from the original on 11 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20220120113046/https://www.timkensteel.com/what-we-make/high-performance-steel. Archived from the original on 20 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 "2020 AIST Electric Arc Furnace Roundup". Association for Iron & Steel Technology. January 2020.
{{cite magazine}}
: Cite magazine requires|magazine=
(help) - ↑ https://web.archive.org/web/20210818083121/http://www.timkensteel.com/what-we-make. Archived from the original on 18 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220319042655/http://www.timkensteel.com/~/media/who-we-are/Certificate/TimkenSteel_Canton_EMS_10_2021.ashx. Archived from the original on 19 March 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 16.0 16.1 16.2 16.3 (PDF) https://s1.q4cdn.com/312465361/files/doc_financials/2021/ar/TMST-49880_Bmkd-Proxy_10-K-FINAL.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) http://s1.q4cdn.com/312465361/files/doc_financials/2020/q4/Financial-Information-Historical-Data-Updates-FY20.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 18.0 18.1 https://www.timkensteel.com/~/media/who-we-are/Sustainability/TMS_ESG_2021_FINAL_422_sm.ashx.
{{cite web}}
: Missing or empty|title=
(help)