Tingo 2 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Tingo 2 hydroelectric plant (Central Hidroeléctrica Tingo 2) is a hydroelectric power plant in pre-construction in Utcubamba, Amazonas, Peru.
Project Details
Table 1: Project details for Tingo 2 hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|
Pre-construction[1] | 2026 (planned)[2] | 148 MW[3] | Run-of-river[2] | Energoret[3] |
Location
Table 2: Location details for Tingo 2 hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Utcubamba, Amazonas, Peru[3] | -5.7592, -78.4507 (approximate)[3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20221006210827/http://www.minem.gob.pe/minem/archivos/PAD%20CH%20Tingo%20p1_compressed-1-300.pdf. Archived from the original (PDF) on 06 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 https://www.power-technology.com/marketdata/power-plant-profile-tingo-ii-peru/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20230130000302/https://www.rumbominero.com/peru/noticias/energia/energoret-recibe-concesion-definitiva-para-tingo-ii-y-iii/. Archived from the original on 30 January 2023.
{{cite web}}
: Missing or empty|title=
(help)