Tongmei Tashan power station (晋能控股漳泽电力塔山发电厂) is an operating power station of at least 2520-megawatts (MW) in Tashan Mine Area, Nanjiao, Datong, Shanxi, China with multiple units, some of which are not currently operating. It is also known as 晋能控股漳泽电力塔山发电公司二期低热值煤发电 (Phase II Unit 3, Phase II Unit 4), 晋能控股漳泽电力塔山发电公司三期 (Phase III Unit 5, Phase III Unit 6).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Tongmei Tashan power station Tashan Mine Area, Nanjiao, Datong, Shanxi, China 39.9249917, 113.0839199 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 39.9249917, 113.0839199

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating coal: bituminous 600 subcritical 2008
Phase I Unit 2 operating coal: bituminous 600 subcritical 2008
Phase II Unit 3 operating coal: waste coal 660 supercritical 2016
Phase II Unit 4 operating coal: waste coal 660 supercritical 2016
Phase III Unit 5 shelved coal: unknown 1000 ultra-supercritical
Phase III Unit 6 shelved coal: unknown 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Shanxi Zhang Electricity Datangta Shan Power Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [60.0%]; Datang International Power Generation Co Ltd [40.0%]
Phase I Unit 2 Shanxi Zhang Electricity Datangta Shan Power Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [60.0%]; Datang International Power Generation Co Ltd [40.0%]
Phase II Unit 3 Sujin Tashan Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [40.0%]; Jiangsu Guoxin Corp Ltd [30.6%]; China Coal Energy Co Ltd [9.0%]; Top Energy Company Ltd.Shanxi [5.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [5.3%]; China Power International Development Co Ltd [4.9%]; China Cinda Asset Management Co Ltd [2.7%]; Tianze Development Co Ltd [0.8%]; Jinneng Holding Group Co Ltd [0.6%]; other [0.4%]
Phase II Unit 4 Sujin Tashan Power Generation Co Ltd [100%] Datang International Power Generation Co Ltd [40.0%]; Jiangsu Guoxin Corp Ltd [30.6%]; China Coal Energy Co Ltd [9.0%]; Top Energy Company Ltd.Shanxi [5.7%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [5.3%]; China Power International Development Co Ltd [4.9%]; China Cinda Asset Management Co Ltd [2.7%]; Tianze Development Co Ltd [0.8%]; Jinneng Holding Group Co Ltd [0.6%]; other [0.4%]
Phase III Unit 5 Shanxi Zhang Electricity Datangta Shan Power Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [60.0%]; Datang International Power Generation Co Ltd [40.0%]
Phase III Unit 6 Shanxi Zhang Electricity Datangta Shan Power Co Ltd [100%] Jinneng Holding Shanxi Electric Power Co Ltd [60.0%]; Datang International Power Generation Co Ltd [40.0%]

Background

Two coal-fired units at the Tongmei Tashan power station, totaling 1,200 MW, were brought online in 2008.[1][2]

Phase II Expansion

Datong Coal planned to build two additional coal-fired units at the plant with a total planned capacity of 1,320 MW. The new units were under construction and scheduled to be completed in 2015.[3]

Units 3-4 began operating in 2016.[4]

Phase III Expansion

In June 2021, reporting referenced a third phase of 2 x 1,000 MW.[5]

In 2023, with no apparent further news, Phase III was presumed to be shelved.