Top Hat Wind Project

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Top Hat Wind Project is a wind farm under construction in Atlanta, Logan County, Illinois, United States.

Project Details

Table 1: Phase-level project details for Top Hat Wind Project

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Construction[1] 2025 (planned)[1] 200 MW[2] Onshore[2] Invenergy LLC [100%][2]

Location

Table 2: Phase-level location details for Top Hat Wind Project

Phase Name Location Coordinates (WGS 84)
1 Atlanta, Logan County, Illinois, United States[3] 40.0929, -89.2468 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Next phase of Top Hat wind farm roadway construction begins soon". newherald.news. Archived from the original on 2024-10-08. Retrieved 2024-09-11.
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125182211/https://archives.lincolndailynews.com/2022/Mar/24/NEWS/today_COUNTY.shtml. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240131182327/https://pantagraph.com/weather/proposed-logan-county-wind-farm-goes-to-vote-despite-weather-radar-concerns/article_a896ab9c-6524-11ed-ae7b-9b7fe1c1b605.html. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)