Tosyali-SULB Benghazi Plant

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Tosyali-SULB Benghazi Plant (توسيالي - صلب) is a steel plant in Benghazi, Cyrenaica, Libya that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.

Location

The map below shows the approximate location of the plant in Benghazi, Cyrenaica, Libya:

Loading map...
  • Location:
  • Coordinates (WGS 84): 32.12156, 20.08413 (approximate)

Plant Details

Table 1: General Plant Details

Announced date
2024-07-19[1]

Table 2: Ownership and Parent Company Information

Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Libya United Steel Company for Iron and Steel Industry; Tosyalı Holding AŞ unknown; 5000866267 E100002004577; E100001000709 Tosyali Sulb Steel Industries Joint Company[2] unknown E100002003914

Table 3: Process and Products

Main production equipment
DRI; EAF

Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
announced 2700[1] 2700[1]

Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)

1Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1 Sponge iron/DRI capacity Nominal iron capacity (total)
announced 8100[2] 8100[2]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Sinter Pellets
NF NF

Unit Details

Table 7: Direct Reduced Iron Furnace Details

Unit name Status Announced date Furnace manufacturer and model Furnace type Current capacity (ttpa)
unknown DRI announced[1] 2024-07-19[1] Midrex Midrex Flex[1][1] shaft furnace 8100[2]

Table 8: Electric Arc Furnace Details

Unit name Status Announced date Current capacity (ttpa)
unknown EAF announced[1] 2024-07-19[1] 2700[1]

Table 9: Electric Arc Furnace Feedstock Details

Unit name Scrap-based % DRI
unknown EAF unknown >0[1]

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://gmk.center/en/news/turkeys-tosyali-to-build-the-worlds-largest-dri-production-complex-in-libya/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://www.tosyalisulb.com.ly/. {{cite web}}: Missing or empty |title= (help)

Resources