Tramm-Göthen solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Tramm-Göthen solar farm is a solar farm under construction in Ludwigslust-Parchim, Mecklenburg-Vorpommern, Germany.
Project Details
Table 1: Phase-level project details for Tramm-Göthen solar farm
Status | Commissioning year | Nameplate capacity | Technology |
---|---|---|---|
Construction[1] | 2022 (planned)[1] | 172 MW[2] | PV |
Read more about solar capacity ratings.
Location
Table 2: Phase-level location details for Tramm-Göthen solar farm
Location | Coordinates (WGS 84) |
---|---|
Ludwigslust-Parchim, Mecklenburg-Vorpommern, Germany[2] | 53.5253, 11.6569 (exact)[2] |
The map below shows the exact location of the solar farm phase:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Homepage". Belectric. Archived from the original on October 22, 2021. Retrieved December 14, 2021.
- ↑ 2.0 2.1 2.2 "Tramm-Göthen Site Journal". Belectric. Archived from the original on August 15, 2021. Retrieved December 14, 2021.