Travnik Galica wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Travnik Galica wind farm is a wind farm in Travnik, Bosnia and Herzegovina.

Project Details

Table 1: Phase-level project details for Travnik Galica wind farm

Status Nameplate capacity Type Owner
Cancelled (inferred March 2023) 50 MW[1] Onshore[2] TLG DOO [100%][3]

Location

Table 2: Phase-level location details for Travnik Galica wind farm

Location Coordinates (WGS 84)
Travnik, Bosnia and Herzegovina[1] 44.2294, 17.643 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240125210321/https://www.iene.eu/bosnias-tlg-plans-130-mln-euro-vlasic-galica-wind-park-projects-p1383.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) http://www.fipa.gov.ba/investinbih/index_htm_files/Wind%20farm%20Galica%20Vlasic.pdf. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240131115933/https://renewablesnow.com/news/bosnias-tlg-applies-for-environmental-permit-for-vlasic-wind-park-project-465243/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)