Trebinje solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Trebinje solar farm is a solar photovoltaic (PV) farm under construction in Trebinje, Trebinje Municipality, Republika Srpska, Bosnia and Herzegovina.
Project Details
Table 1: Phase-level project details for Trebinje solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1] | 2025 (planned)[2] | 73 MWp/dc[1] | PV[3] | Elektroprivreda Republike Srpske AD [30%]; Lugos Renewables [70%][4] | Elektroprivreda Republike Srpske[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Trebinje solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Trebinje, Trebinje Municipality, Republika Srpska, Bosnia and Herzegovina[5] | 43.8261, 18.3576 (approximate)[5] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Construction: BiH will get the largest Solar Power Plant in the Balkans". 2024-02-11. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
- ↑ https://www.power-technology.com/data-insights/power-plant-profile-trebinje-1-solar-pv-park-bosnia-and-herzegovina/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240207125009/https://renewablesnow.com/news/hungarys-lugos-renewables-to-control-70-of-bosnias-trebinje-pv-plant-report-777405/. Archived from the original on 2024-02-07.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://renewablesnow.com/news/hungarys-lugos-renewables-to-control-70-of-bosnias-trebinje-pv-plant-report-777405/ https://renewablesnow.com/news/hungarys-lugos-renewables-to-control-70-of-bosnias-trebinje-pv-plant-report-777405/, https://renewablesnow.com/news/hungarys-lugos-renewables-to-control-70-of-bosnias-trebinje-pv-plant-report-777405/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.0 5.1 https://balkangreenenergynews.com/works-on-first-out-of-three-solar-power-plants-in-city-of-sun-trebinje-could-start-in-spring-2022/ https://en.wikipedia.org/wiki/Trebinje, https://balkangreenenergynews.com/works-on-first-out-of-three-solar-power-plants-in-city-of-sun-trebinje-could-start-in-spring-2022/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)