Tressentin Süd solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Tressentin Süd solar farm is a solar photovoltaic (PV) farm in pre-construction in Vorpommern-Rügen, Mecklenburg-Vorpommern, Germany.

Project Details

Table 1: Phase-level project details for Tressentin Süd solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2024 (planned)[1] 50 MWp/dc[1] PV[1] Engie SA; Cromess GMBH[1] Engie SA[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Tressentin Süd solar farm

Location Coordinates (WGS 84)
Vorpommern-Rügen, Mecklenburg-Vorpommern, Germany[1] 54.1750, 12.4927 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.engie-deutschland.de/en/press/engie-and-cromess-realize-50-mwp-solar-park-marlow. {{cite web}}: Missing or empty |title= (help)