Trillo (Repsol) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Trillo 1, Trillo 4, Trillo 2, Trillo 3
Trillo (Repsol) solar farm is a solar photovoltaic (PV) farm in pre-construction in Brihuega, Guadalajara, Castilla-La Mancha, Spain.
Project Details
Table 1: Phase-level project details for Trillo (Repsol) solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
1 | Pre-construction[1] | 49.5 MWp/dc[1] | PV[1] | Repsol SA[2] |
2 | Pre-construction[3] | 49.5 MWp/dc[1] | PV[3] | Repsol SA[2] |
3 | Pre-construction[4] | 49.5 MWp/dc[4] | PV[4] | Repsol SA[2] |
4 | Pre-construction[5] | 49.5 MWp/dc[5] | PV[5] | Repsol SA[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Trillo (Repsol) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] | 40.7636, -2.8696 (approximate)[6] |
2 | Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] | 40.7636, -2.8696 (approximate)[6] |
3 | Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] | 40.7636, -2.8696 (approximate)[6] |
4 | Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] | 40.7636, -2.8696 (approximate)[6] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Resolución de 23/08/2023, de la Dirección General de Transición Energética, sobre autorización administrativa previa de la instalación solar fotovoltaica denominada Trillo Solar 1, infraestructuras auxiliares y de evacuación (referencia: 2703/01233). [2023/7379]". 2023-08-31. Archived from the original on 2024-04-24. Retrieved 2024-04-12.
- ↑ 2.0 2.1 2.2 2.3 "Castilla-La Mancha dio luz verde a más de 3 GW renovables durante el 2023 - Energía Estratégica España - Noticias sobre energías renovables del mercado ibérico". Energía Estratégica. 2023-12-15. Archived from the original on 2024-04-11. Retrieved 2024-04-07.
- ↑ 3.0 3.1 https://docm.jccm.es/docm/detalleDocumento.do?idDisposicion=1693294382921300028.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://docm.jccm.es/docm/detalleDocumento.do?idDisposicion=1692271280329000123.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://docm.jccm.es/docm/detalleDocumento.do?idDisposicion=1693294602827300030.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://docm.jccm.es/docm/descargarArchivo.do?ruta=2023/08/31/pdf/2023_7379.pdf&tipo=rutaDocm https://maps.app.goo.gl/R8dtBtYJpxweePR29, https://docm.jccm.es/docm/descargarArchivo.do?ruta=2023/08/31/pdf/2023_7379.pdf&tipo=rutaDocm.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)