Trillo (Repsol) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Trillo 1, Trillo 4, Trillo 2, Trillo 3

Trillo (Repsol) solar farm is a solar photovoltaic (PV) farm in pre-construction in Brihuega, Guadalajara, Castilla-La Mancha, Spain.

Project Details

Table 1: Phase-level project details for Trillo (Repsol) solar farm

Phase name Status Nameplate capacity Technology Owner
1 Pre-construction[1] 49.5 MWp/dc[1] PV[1] Repsol SA[2]
2 Pre-construction[3] 49.5 MWp/dc[1] PV[3] Repsol SA[2]
3 Pre-construction[4] 49.5 MWp/dc[4] PV[4] Repsol SA[2]
4 Pre-construction[5] 49.5 MWp/dc[5] PV[5] Repsol SA[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Trillo (Repsol) solar farm

Phase Name Location Coordinates (WGS 84)
1 Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] 40.7636, -2.8696 (approximate)[6]
2 Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] 40.7636, -2.8696 (approximate)[6]
3 Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] 40.7636, -2.8696 (approximate)[6]
4 Brihuega, Guadalajara, Castilla-La Mancha, Spain[6] 40.7636, -2.8696 (approximate)[6]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 "Resolución de 23/08/2023, de la Dirección General de Transición Energética, sobre autorización administrativa previa de la instalación solar fotovoltaica denominada Trillo Solar 1, infraestructuras auxiliares y de evacuación (referencia: 2703/01233). [2023/7379]". 2023-08-31. Archived from the original on 2024-04-24. Retrieved 2024-04-12.
  2. 2.0 2.1 2.2 2.3 "Castilla-La Mancha dio luz verde a más de 3 GW renovables durante el 2023 - Energía Estratégica España - Noticias sobre energías renovables del mercado ibérico". Energía Estratégica. 2023-12-15. Archived from the original on 2024-04-11. Retrieved 2024-04-07.
  3. 3.0 3.1 https://docm.jccm.es/docm/detalleDocumento.do?idDisposicion=1693294382921300028. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://docm.jccm.es/docm/detalleDocumento.do?idDisposicion=1692271280329000123. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://docm.jccm.es/docm/detalleDocumento.do?idDisposicion=1693294602827300030. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 https://docm.jccm.es/docm/descargarArchivo.do?ruta=2023/08/31/pdf/2023_7379.pdf&tipo=rutaDocm https://maps.app.goo.gl/R8dtBtYJpxweePR29, https://docm.jccm.es/docm/descargarArchivo.do?ruta=2023/08/31/pdf/2023_7379.pdf&tipo=rutaDocm. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)