Tubed Coal Mine

From Global Energy Monitor
(Redirected from Tubed coal mine)
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Tubed Coal Mine is an operating coal mine in Tubed, Latehar, Jharkhand, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Tubed Coal Mine Tubed, Latehar, Jharkhand, India 23.82119, 84.57721 (approximate)

The map below shows the approximate location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Operating[1] New 2023[1]

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
6[2] Surface 4.6 230 1163*

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
189 Auranga Lignite Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Damodar Valley Corporation[2] Damodar Valley Corp [100%] India

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM 0[3] 1[4]

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background on Mine

The proposed 6 million ton-per-annum Tubed coal mine is a proposal of Tubed Coal Mines Limited, a 60-40 consortium consisting of Hindalco Industries (a subsidiary of Aditya Birla Group) and Tata Power (a subsidiary of Tata Group). The mine would thus be one of very few private coal mines in India. The mine's coal would be used to power Hindalco's Jharkhand Aluminium power station and Tata's Tiruldih Power Project. The coal block was allocated in August 2007, and the geological reserve was purchased in October 2007. Some permits have been issued, but others may still be outstanding.[5][6]

It is unclear whether this proposal is still active, though a site inspection was conducted on August 13, 2019.[7]

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://web.archive.org/web/20240124191623/https://coal.gov.in/sites/default/files/2023-06/MoM-02-02-2023.pdf. Archived from the original (PDF) on 24 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20240123175603/https://www.dvc.gov.in/storage/app/tender_file/99FINAL%2520EOI%2520PIPE%2520CONVEYOR.pdf. Archived from the original (PDF) on 23 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://coal.nic.in/sites/default/files/2023-10/17-10-2023a-wn.pdf. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20240716152817/https://coal.gov.in/sites/default/files/2023-06/MoM08042024.pdf. Archived from the original (PDF) on 16 July 2024. {{cite web}}: Missing or empty |title= (help)
  5. Tubed Coal Block Mining Project, Tata Power, accessed May 2015.
  6. About Us, Tubed Coal Mines Limited website, accessed May 2015.
  7. Forest Clearance Inspection, August 13, 2019