Tungsten Mountain solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Tungsten Mountain solar farm is an operating solar photovoltaic (PV) farm in Fallon, Churchill, Nevada, United States.

Project Details

Table 1: Phase-level project details for Tungsten Mountain solar farm

Status Commissioning year Nameplate capacity Technology Operator
Operating[1] 2019[1] 7.3 MWac[1] PV[1] Tungsten Mountain[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Tungsten Mountain solar farm

Location Coordinates (WGS 84)
Fallon, Churchill, Nevada, United States[1] 39.667, -117.694 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)