Turkmenbashi oil processing complex power station (Электростанция Туркменбашинского комплекса нефтеперерабатывающих заводов, электростанция ТКНПЗ (Russian)) is an operating power station of at least 140-megawatts (MW) in Turkmenbashi, Balkan, Turkmenistan. It is also known as Turkmenbashi Oil Refinery OCGT Power Plant, TKNPZ power station, TOPC power station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Turkmenbashi oil processing complex power station | Turkmenbashi, Balkan, Turkmenistan | 40.02169, 52.96461 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2: 40.02169, 52.96461
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2][3][4][5][6] | fossil gas: natural gas[5] | 70[5][2] | gas turbine[5][2] | no[5] | 2023[3][6] |
2 | Operating[2][3][4][5][6] | fossil gas: natural gas[5] | 70[5][2] | gas turbine[5][2] | no[5] | 2023[3][6] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Turkmennebit [100%][7] | Turkmennebit [100.0%] |
2 | Turkmennebit [100%][7] | Turkmennebit [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): power[5]
- Captive industry: Oil & Refining[5]
- Non-industry use: none[5]
Background
The project was announced in September of 2020. New units will provide electricity to Turkmenbashy Complex of Refineries (TKNPZ or TCOR). The project will be implemented by Çalik Energy, a wholly owned company of the Turkish Çalik Holding, which committed to complete the construction in 18 months - by May 2022.[8][9] The units were commissioned in November 2023. In addition to fully meeting the needs of TKNPZ for electricity, the new units will supply excess electricity to the country's unified energy system.[10]
Articles and Resources
References
- ↑ https://www.google.com/maps/place/Turkmenbashi+OilRefinery+OCGT+Power+Plant+Turkmenistan/@40.0215316,52.9619934,17z/data=!3m1!4b1!4m6!3m5!1s0x402c1424bacbb4cf:0xbc2ed2542c463476!8m2!3d40.0215316!4d52.9645683!16s%2Fg%2F11dzw8cmd4.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20200930183552/https://oilgas.gov.tm/en/posts/news/642/gurbanguly-berdimuhamedov-launched-the-construction-of-new-power-units-at-tcor. Archived from the original on 30 September 2020.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20220116224157/https://calikenerji.com/calik-enerji-undertakes-power-plant-construction-project-in-turkmenistan. Archived from the original on 16 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://www.oilgas.gov.tm/ru/posts/news/9069/na-tknpz-gotovyatsya-vvesti-v-stroy-dve-novye-gazoturbinnye-elektrostantsii.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 https://web.archive.org/web/20230406115047/https://www.newscentralasia.net/2020/09/10/foundation-laying-of-new-power-plant-at-turkmenbashi-refinery-gb-receives-heads-of-calik-holding-lukoil/. Archived from the original on 06 April 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 https://www.newscentralasia.net/2023/11/04/turkmenistan-zapuskayet-novyye-proyekty-v-sfere-energetiki-i-sotsialnoy-infrastruktury-na-zapade-strany/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20230206192812/https://tngizt.gov.tm/en/about. Archived from the original on 06 February 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs namedref_1
- ↑ "Çalık Enerji Undertakes Power Plant Construction Project in Turkmenistan". Çalık Enerji. Retrieved September 28, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Туркменистан запускает новые проекты в сфере энергетики и социальной инфраструктуры на западе страны". www.newscentralasia.net. November 4, 2023. Retrieved December 22, 2023.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.