Tyra II Oil and Gas Phase (Denmark)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Tyra II Oil and Gas Phase is an in development oil and gas phase in Denmark.

Along with Tyra I Oil and Gas Field (Denmark) and Tyra Southeast Oil and Gas Field (Denmark), Tyra II is a part of the Tyra Oil and Gas Project (Denmark).

Project Details

Main Data

Table 1: Phase-level project details for Tyra II Oil and Gas Phase

*Final Investment Decision
Unit name Status Operator Owner Discovery year FID* year Production start year
Tyra II In development[1] TotalEnergies[2] TotalEnergies (43.2%); BlueNord (36.8%); Nordsøfonden (20.0%)[2] 1968[3] 2017[4] 2024 (expected)[5]

Production and Reserves

Table 2: Production from Tyra II Oil and Gas Phase

million m³/y = million cubic meters per year
Category Fuel Description Quantity Units Data Year Source
production design capacity gas 3722.59 million m³/y 2024 [6]

Location

Table 3: phase-level location details for Tyra II Oil and Gas Phase

Concession/Block Location Coordinates (WGS 84)
5504/12; 5504/11[7] Offshore, Denmark[8] 55.6501, 4.8943 (approximate)[8]

The map below shows the approximate location of the phase(s) within the Tyra complex:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. https://www.offshore-energy.biz/tyra-ii-makes-another-step-towards-the-finish-line-with-first-gas-still-on-track-for-winter/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://tyra2.dk/en/tyra-ii-is-ready-to-be-powered-up/. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20210802013600/https://www.wiki.total/en/country/total-denmark. Archived from the original on 02 August 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20230816221339/https://mb.cision.com/Main/4225/3742632/1950149.pdf. Archived from the original (PDF) on 16 August 2023. {{cite web}}: Missing or empty |title= (help)
  5. Danish Energy Agency (PDF). 44804 https://ens.dk/sites/ens.dk/files/OlieGas/ressourcer_og_prognose_2022_dk.pdf. Archived (PDF) from the original on August 17 2023. Retrieved August 17 2023. {{cite web}}: Check date values in: |access-date=, |date=, and |archive-date= (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20221007031903/https://www.reuters.com/business/energy/denmarks-tyra-gas-field-faces-delay-six-nine-months-2022-08-03/. Archived from the original on 07 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. "Shape file with Offshore Installations". Danish Energy Agency. Archived from the original on August 16 2023. Retrieved August 16 2023. {{cite web}}: Check date values in: |access-date= and |archive-date= (help)
  8. 8.0 8.1 "Shape Files on Oil and Gas for Maps". Danish Energy Agency. 2020. Archived from the original on April 13, 2021. Retrieved April 13, 2021.