Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Tyukalinsk-Valuevskaya-Nalimovskaya-Nazyvaevsk Gas Pipeline (Газопровод-отвод ГРС «Тюкалинск» - ГРС «Валуевская» - ГРС «Налимовская» - ГРС «Называевск») is a proposed gas pipeline in Russia.[1]

Location

The pipeline is proposed to run from Tyukalinsk gas distribution station in Tyukalinsk, Omsk Oblast, on to Valuevskaya gas distribution station in Valuevka, Omsk Oblast, on to Nalimovskaya gas distribution station in Nalimovo, Omsk Oblast, to Nazyvaevsk gas distribution station in Nazyvaevsk, Omsk Oblast, Russia.

Loading map...

Project details

  • Operator:
  • Owner: Gazprom[1]
  • Parent company: Gazprom
  • Capacity: 0.041 bcm/year[2]
  • Length: 98 km[3]
  • Diameter:
  • Status: Construction[4]
  • Start year: 2023[4]
  • Cost:
  • Financing:
  • Associated infrastructure: SRTO-Surgut-Omsk Gas Pipeline

Background

The pipeline was included in the gas supply development program of Gazprom for 2021-2025 for the Omsk region.[1] It is a distribution pipeline. The pipeline would be built in separate segments, starting with a segment extending from the existing gas distribution station in Tyukalinsk to Valuevskaya, then Valuevskaya-Nalimovskaya, and Nalimovskaya-Nazyvaevsk, along with a gas distribution station at each of these locations.[1] There are also plans to extend the pipeline to Isilkul in the Omsk region in the future.[3]

The pipeline was expected to be commissioned by the end of 2022.[5] As of June 2023, the construction of the pipeline from Tyukalinsk to Valuevskaya and from Valuevskaya to Nalimovskaya was completed. The remaining section of the pipeline from Nalimovskaya to Nazyvaevsk is planned to be commissioned in the fall of 2023.[6]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "Программа газификации 2021–2025 в Омской области". Gazprommap.ru. 2022. Retrieved Jul 20, 2022.{{cite web}}: CS1 maint: url-status (link)
  2. "Распоряжение Правительства Российской Федерации от 06.05.2015 г. № 816-р". Правительство России. Retrieved 2022-08-05.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "В Тюкалинском районе Омской области строится ГРС Валуевская". NefteGaz.ru. August 26, 2021. Retrieved July 24, 2023.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "Как изменилась пятилетняя программа развития газоснабжения и газификации Омской области". ngs55.ru. 2023-06-04.{{cite web}}: CS1 maint: url-status (link)
  5. "В Называевском районе Омской области началось строительство газопровода-отвода и газораспределительной станции". mrg.gazprom.ru (in русский). Retrieved 2022-08-05.
  6. "Как изменилась пятилетняя программа развития газоснабжения и газификации Омской области". ngs55.ru. June 13, 2023. Retrieved July 25, 2023.{{cite web}}: CS1 maint: url-status (link)