Uluköy power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Uluköy power station (Uluköy Termik Santrali) is a cancelled power station in Uluköy, Dinar, Afyon, Türkiye.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Uluköy power station Uluköy, Dinar, Afyon, Türkiye 38.199984, 30.27055 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4: 38.199984, 30.27055

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology
Unit 1 cancelled coal: lignite 160 CFB
Unit 2 cancelled coal: lignite 160 CFB
Unit 3 cancelled coal: lignite 160 CFB
Unit 4 cancelled coal: lignite 160 CFB

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 KLK Enerji Üretim AŞ [100%] Kolin Group
Unit 2 KLK Enerji Üretim AŞ [100%] Kolin Group
Unit 3 KLK Enerji Üretim AŞ [100%] Kolin Group
Unit 4 KLK Enerji Üretim AŞ [100%] Kolin Group

Project-level coal details

  • Coal source(s): domestic, Afyon Uluköy coal mine

Background

In June 2013, KLK Madencilik (a subsidiary of the Kulak Group) began the environmental permitting process to build a 640-MW, $675 million, mine-to-mouth coal-fired power plant in Afyon province. The plant would be built alongside a new KLK lignite coal mine with approximately 151 million tons of reserves.[1][2]

An environmental hearing was held in Uluköy in July 2013.[3] A feasibility report was submitted in 2014.[4]

As of December 2020 the project had not progressed in more than six years, and it appears to be cancelled.

Environmental impact

Nearby residents have expressed concern that the water taken by the plant from the Mendes River will cause the river to dry out.[5]

Articles and Resources

References

  1. KLK Madencilik Uluköy Termik Santralı ÇED süreci başladı, Enerji Günlüğü, June 14, 2013.
  2. KLK Madencilik ve Elektrik Enerjisi A.Ş., Uluköy Termik Santrali ve Santrala Yakıt Sağlayan Maden Sahası ÇED Başvuru Dosyası, submitted to Ministry of Environment & Urban Planning, 2013.
  3. Dinar'da termik santral için ÇED raporu toplantısı, 03 Haber, July 19, 2013.
  4. Feasibility report, Kulak Group, 2014
  5. Menderes Nehri'ni kurutacak proje hayata geçmek üzere, Ozgur Denizli, Dec. 2, 2018

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.