Uluköy power station (Uluköy Termik Santrali) is a cancelled power station in Uluköy, Dinar, Afyon, Türkiye.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Uluköy power station | Uluköy, Dinar, Afyon, Türkiye | 38.199984, 30.27055 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 38.199984, 30.27055
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|---|
Unit 1 | cancelled | coal: lignite | 160 | CFB |
Unit 2 | cancelled | coal: lignite | 160 | CFB |
Unit 3 | cancelled | coal: lignite | 160 | CFB |
Unit 4 | cancelled | coal: lignite | 160 | CFB |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | KLK Enerji Üretim AŞ [100%] | Kolin Group |
Unit 2 | KLK Enerji Üretim AŞ [100%] | Kolin Group |
Unit 3 | KLK Enerji Üretim AŞ [100%] | Kolin Group |
Unit 4 | KLK Enerji Üretim AŞ [100%] | Kolin Group |
Project-level coal details
- Coal source(s): domestic, Afyon Uluköy coal mine
Background
In June 2013, KLK Madencilik (a subsidiary of the Kulak Group) began the environmental permitting process to build a 640-MW, $675 million, mine-to-mouth coal-fired power plant in Afyon province. The plant would be built alongside a new KLK lignite coal mine with approximately 151 million tons of reserves.[1][2]
An environmental hearing was held in Uluköy in July 2013.[3] A feasibility report was submitted in 2014.[4]
As of December 2020 the project had not progressed in more than six years, and it appears to be cancelled.
Environmental impact
Nearby residents have expressed concern that the water taken by the plant from the Mendes River will cause the river to dry out.[5]
Articles and Resources
References
- ↑ KLK Madencilik Uluköy Termik Santralı ÇED süreci başladı, Enerji Günlüğü, June 14, 2013.
- ↑ KLK Madencilik ve Elektrik Enerjisi A.Ş., Uluköy Termik Santrali ve Santrala Yakıt Sağlayan Maden Sahası ÇED Başvuru Dosyası, submitted to Ministry of Environment & Urban Planning, 2013.
- ↑ Dinar'da termik santral için ÇED raporu toplantısı, 03 Haber, July 19, 2013.
- ↑ Feasibility report, Kulak Group, 2014