United Laboratories Linhe power station (联邦制药(内蒙古)动力车间) is an operating power station of at least 600-megawatts (MW) in Bayi Town, Linhe, Bayannur, Inner Mongolia, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
United Laboratories Linhe power station | Bayi Town, Linhe, Bayannur, Inner Mongolia, China | 40.813738, 107.509185 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 40.813738, 107.509185
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | operating | coal: bituminous | 300 | subcritical | 2012 |
Unit 2 | operating | coal: bituminous | 300 | subcritical | 2012 |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | The United Laboratories (Inner Mongolia) Co Ltd [100%] | Pinghui [100.0%] |
Unit 2 | The United Laboratories (Inner Mongolia) Co Ltd [100%] | Pinghui [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): both
- Captive industry: Chemicals
Background on Project
In August 2012 it was reported that United Laboratories Group was nearing completion of a 2 x 300 MW supercritical captive coal plant in Linhe District. The news was part of investigative reporting into the project, as the plant lacked permits for construction and operation.[1]
Articles and Resources
References
- ↑ "内蒙联邦制药环保质疑声中建热电厂 审批存疑," 新华新闻, 2012年08月06日
Additional data