United States Steel Corporation United States green steel project

From Global Energy Monitor
This article is part of the
Global Iron and Steel Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

United States Steel Corporation United States green steel project is located in California, United States. It is part of the Green Steel Tracker.

Location

The map below shows the approximate (country) location of the project in California, United States:

Loading map...
  • Coordinates (WGS 84): 37.81585133, -122.2882073 (approximate (country))

Project Details

Table 1: Green Steel Project Details

All references for the above data are available in the Green Steel Tracker.
Project Details
Project name Molten Industries Pilot
Company United States Steel Corporation
Company has climate goals? Yes
Location California, United States
Project website Not available
Project scale Pilot
Project status Announced
Year to be online Not stated
Technology to be used Biogenic syngas DRI
Technology details Methane-pyrolysis-driven hydrogen production with a pilot direct reduced iron (DRI)
Iron production capacity (million tonnes per year) Not stated
Steel production capacity (million tonnes per year) Not stated
CO2 capture (million tonnes CO2 per year) Not stated
Hydrogen generation capacity(MW) Not stated
Investment size (m USD) 5.4
Partners Molten Industries, CPFD Software
Date of announcement 2024-07-23

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.