Upper Baker hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Upper Baker hydroelectric plant is an operating hydroelectric power plant in Concrete, Whatcom County, Washington, United States.

Project Details

Table 1: Project details for Upper Baker hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner
Operating[1] 1959[1] 105 MW[1] 2[1] Conventional storage[1] Puget Sound Energy (PSE)[2]

Location

Table 2: Location details for Upper Baker hydroelectric plant

Location River Complex Coordinates (WGS 84)
Concrete, Whatcom County, Washington, United States[1][3] Baker River[3] Baker River Complex[2] 48.649, -121.691 (exact)[1]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 US Energy Information Administration (December 27, 2022). "Preliminary Monthly Electric Generator Inventory - November". Retrieved January 13, 2023.
  2. 2.0 2.1 https://web.archive.org/web/20220324000223/https://www.pse.com/en/pages/facilities/baker-river-hydro-project. Archived from the original on 24 March 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 US Energy Information Administration (September 22, 2022). "Form EIA-860 detailed data with previous form data". Retrieved January 13, 2023.