Upper Marsyangdi 2 hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Upper Marsyangdi 2 hydroelectric plant is a hydroelectric power plant in pre-construction in Taghring, Lamjung, Nepal.

Project Details

Table 1: Project details for Upper Marsyangdi 2 hydroelectric plant

Status Nameplate capacity Technology type Owner Operator
Pre-construction[1] 327 MW[2] Conventional and run-of-river[3] Grandhi Mallikarjuna Rao (GMR)[4] Himtal Hydro Power CO PVT LTD[4]

Location

Table 2: Location details for Upper Marsyangdi 2 hydroelectric plant

Location River Coordinates (WGS 84)
Taghring, Lamjung, Nepal[3] Marsyangd River[4] 28.3678, 84.3583 (exact)[3]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 20 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20220307053658/http://www.xinhuanet.com/english/asiapacific/2021-06/24/c_1310024203.htm. Archived from the original on 07 March 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://cdm.unfccc.int/Projects/Validation/DB/I76MADT5JWKLKHZJAVPZOOBX23RA2J/view.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20220808100032/https://www.gmrgroup.in/himtal-hydropower/. Archived from the original on 08 August 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)