Upper Marsyangdi 2 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Upper Marsyangdi 2 hydroelectric plant is a hydroelectric power plant in pre-construction in Taghring, Lamjung, Nepal.
Project Details
Table 1: Project details for Upper Marsyangdi 2 hydroelectric plant
Status | Nameplate capacity | Technology type | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 327 MW[2] | Conventional and run-of-river[3] | Grandhi Mallikarjuna Rao (GMR)[4] | Himtal Hydro Power CO PVT LTD[4] |
Location
Table 2: Location details for Upper Marsyangdi 2 hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Taghring, Lamjung, Nepal[3] | Marsyangd River[4] | 28.3678, 84.3583 (exact)[3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 20 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220307053658/http://www.xinhuanet.com/english/asiapacific/2021-06/24/c_1310024203.htm. Archived from the original on 07 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://cdm.unfccc.int/Projects/Validation/DB/I76MADT5JWKLKHZJAVPZOOBX23RA2J/view.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20220808100032/https://www.gmrgroup.in/himtal-hydropower/. Archived from the original on 08 August 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)