Upper Seti 1 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Upper Seti 1 hydroelectric plant is a hydroelectric power plant in pre-construction in Ward No 2, Machhapuchchhre Rural Municipality, Kaski District, Gandaki Province, Nepal.
Project Details
Table 1: Project details for Upper Seti 1 hydroelectric plant
Status | Nameplate capacity | Technology type | Owner |
---|---|---|---|
Pre-construction[1] | 13 MW[2] | Run-of-river[3] | Shrestha Energy Solution Pvt Ltd [100%][2] |
Location
Table 2: Location details for Upper Seti 1 hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Ward No 2, Machhapuchchhre Rural Municipality, Kaski District, Gandaki Province, Nepal[2] | Seti Khola River[3] | 28.2127, 83.9812 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 2022-10-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://www.investopaper.com/news/upper-seti-1-hydropower-project/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.nwrmap.info/hydropower/upper-seti-1-hep.
{{cite web}}
: Missing or empty|title=
(help)