Upper Tamor A hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Upper Tamor A hydroelectric plant is a hydroelectric power plant in pre-construction in Olangchung Gola Village, Phaktanglung Rural Municipality, Taplejung District, Province No. 1, Nepal.
Project Details
Table 1: Project details for Upper Tamor A hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|
Pre-construction[1] | 2028 (planned)[2] | 72 MW[3] | Run-of-river[4] | Union Hydropower Public Ltd [100%][4] |
Location
Table 2: Location details for Upper Tamor A hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Olangchung Gola Village, Phaktanglung Rural Municipality, Taplejung District, Province No. 1, Nepal[3] | Tamor River[4] | 27.6819, 87.7701 (approximate)[3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 2022-10-20.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.power-technology.com/marketdata/upper-tamor-a-nepal/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20221206083000/https://hydro.naxa.com.np/core/datasets/. Archived from the original on 2022-12-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20221129092209/https://www.unionhydropower.com.np/upper-tamor-a. Archived from the original on 2022-11-29.
{{cite web}}
: Missing or empty|title=
(help)