GNA III power station (Usina Termelétrica GNA III) is a shelved power station in São João da Barra, Rio de Janeiro, Brazil.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
GNA III power station São João da Barra, Rio de Janeiro, Brazil -21.841185, -41.023657 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP
1 Shelved[2][3][4] fossil gas: LNG, fossil gas: natural gas[5] 1927[2][3][4] combined cycle[6] not found

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 Gás Natural Açu[2] Siemens Energy Brasil Ltda; BP PLC; SPIC Brasil SA [33%]; Prumo Logistica SA[7][8][9][5][7][8][9][5][7][8][9][5][7][8][9][5] State Power Investment Corp Ltd [33.0%]; BP PLC; EIG Global Energy Partners LLC; Mubadala Investment Company PJSC; Siemens Energy AG

Background

In November 2019, the Ministry of Mines and Energy (MME) classified the GNA power station as a priority project, encompassing four gas-fired power stations and an onshore terminal.[10] Commercial operations at the 1338 MW GNA I power station began in September 2021, with construction of the 1672 MW GNA II power station expected to begin shortly thereafter, and an additional 3.4 GW of capacity to eventually be added at the GNA III and GNA IV power stations.[11] As of November 2022, plant sponsor Gas Natural Açu still did not list GNA III on its company webpage.[12] However, the project was listed as a participant in Brazil's A-5 national energy auction in September 2021.[13]

Articles and Resources

References

  1. https://web.archive.org/web/20221130051902/https://archive.org/details/brazil-aneel-sigel-usina-termeletrica-2020-04-09. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125090430/https://energiaeambiente.org.br/boletim/boletim-leilao-de-energia-segunda-edicao. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20211112235311/https://www.prumologistica.com.br/en/press/gna-starts-commercial-operations-of-its-first-power-plant-at-port-of-acu-rj/. Archived from the original on 12 November 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 (PDF) https://web.archive.org/web/20240125090022/https://www.epe.gov.br/sites-pt/publicacoes-dados-abertos/publicacoes/PublicacoesArquivos/publicacao-521/topico-543/EPE-DEE-RE-100_2021_rv0_2021-A5.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 (PDF) https://web.archive.org/web/20240125090443/https://www.gna.com.br/Portals/0/press-release/ENG_JointPressRelease_ClosingSPIC_FINAL%20APPROVED.pdf?ver=2021-02-01-180539-140&timestamp=1612203253668. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20240125112223/https://www.gna.com.br/Portals/0/press-release/port-gna-i-inicia-operacao-comercial.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 https://web.archive.org/web/20240125122421/https://www.gna.com.br/en/gna/our-shareholders. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 (PDF) https://web.archive.org/web/20240125090130/https://energiaeambiente.org.br/wp-content/uploads/2022/12/termeletricas_IEMA_2021.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 https://web.archive.org/web/20240125121035/https://www.offshore-energy.biz/chinas-spic-buys-into-brazilian-lng-power-project/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. thunders. "UTE GNA III poderá emitir debêntures de infraestrutura". www.canalenergia.com.br (in português do Brasil). Retrieved 2021-09-14.
  11. "GNA starts commercial operations of its first power plant at Port of Açu (RJ)". Prumo Logística. September 16, 2021.{{cite web}}: CS1 maint: url-status (link)
  12. "Usinas Termelétricas". www.gna.com.br. Retrieved 2022-03-30.{{cite web}}: CS1 maint: url-status (link)
  13. "PORTARIA Nº 937/SPE/MME". Ministério de Minas e Energia/Secretaria de Planejamento e Desenvolvimento Energético. September 14, 2021.{{cite web}}: CS1 maint: url-status (link)