Jacutinga power station (Usina Termelétrica Jacutinga) is a cancelled power station in Jacutinga, Minas Gerais, Brazil.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Jacutinga power station | Jacutinga, Minas Gerais, Brazil | -22.269695, -46.537045 (approximate)[1][2] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
1 | Cancelled[1] | fossil gas: natural gas[1] | 260[1][3] | combined cycle[4] | not found |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | EECO Jacutinga Empreendimentos Energéticos do Centro Oeste SA [100%][1] | Grupo Bom Futuro [100.0%] |
Background
The power station was initially proposed to work in conjunction with the gas pipeline which passes through the city of Jacutinga while producing approximately 2,000 jobs during the construction phase, and was expected to receive at least 800 million reias of investment as of 2016.[5]
In February 2018, the environmental license for the power station was deferred by the Ministry of the Environment.[6] However, later in 2018 the project was granted a preliminary license valid through February 2023.[7]
As of March 2022, there has been no news of the project in more than four years, and it is presumed to be cancelled.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://sigel.aneel.gov.br/portal/home/index.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125123137/http://sistemas.meioambiente.mg.gov.br/licenciamento/uploads/Lgnd9mX7LXj-8S10kksgWOf-cfmklSYH.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210503214536/https://www.jacutinga.mg.gov.br/site/index.php/home/noticias/1860-prefeito-viabiliza-instalacao-de-termoeletrica-no-municipio. Archived from the original on 03 May 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125112119/http://sistemas.meioambiente.mg.gov.br/licenciamento/uploads/DNBocRaAthGtMVz2ZQ8rJWzgHmQQQrdo.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ www.guiasaojoao.com.br, Portal Guia São João-; www.guiasaojoao.com.br, Portal Guia São João-. "Cidade do Sul de Minas terá investimento milionário". www.guiasaojoao.com.br. Retrieved 2021-09-14.
- ↑ "BRASIL FORTE PARTICIPAÇÕES S/A - USINA TERMOELÉTRICA - UTE DE JACUTINGA". sistemas.meioambiente.mg.gov.br. Retrieved 2021-09-14.
- ↑ "PARECER ÚNICO DE COMPENSAÇÃO AMBIENTAL GCA/DIUC Nº 053/2018" (PDF). Instituto Estadual de Florestas. 2018. Retrieved September 14, 2021.