Norte Fluminense 2 power station (Usina Termelétrica Norte Fluminense 2) is a power station in pre-construction in Macaé, Rio de Janeiro, Brazil.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Norte Fluminense 2 power station | Macaé, Rio de Janeiro, Brazil | -22.318949, -41.847789 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Pre-construction[2][3][4][5] | fossil gas: natural gas, fossil gas: LNG[6][7][8][9] | 1713[6][5] | combined cycle[5] | not found | 2025 (planned)[10] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | EDF Norte Fluminense SA [100%][5] | Electricité de France SA [100.0%] |
Financing
| Electricite de France SA[100.0%][11]
Background
Brazil's environmental authority IBAMA issued a construction license to the Norte Fluminense 2 power station in January 2021.[12] Construction was estimated to take four years and produce approximately 1,100 jobs.[13] Gas for the project would be supplied by the nearby Route 2 gas pipeline and/or the proposed Tepor Macaé FSRU.[14] As of September 2021, EDF was maintaining a website addressing common questions and concerns regarding the power station.[13]
The project was listed as a participant in Brazil's A-5 national energy auction in September 2021[15], but did not emerge victorious.[16] The project still appeared to be in the pre-construction phase as of November 2022.[13][17][18]
Opposition
In November 2022, the Brazilian environmental group Arayara filed a public civil action against Brazil's national environmental authority IBAMA, Rio de Janeiro state environmental authority INEA and four private companies. The filing alleged that the Norte Fluminense 2 power station, along with several other proposed power plants, would have a detrimental impact on water supply and air quality in the region, and requested that additional environmental studies be undertaken prior to further development of the power plants.[18]
Articles and Resources
References
- ↑ (PDF) https://web.archive.org/web/20240125123143/http://www.edfnortefluminense.com.br/wp-content/uploads/2022/03/RIMA-NF2-DIGITAL-PC.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125105039/https://www.folha1.com.br/energia/2022/11/1286245-licenca-para-tepor-eleva-macae.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125105108/https://oeco.org.br/wp-content/uploads/2023/01/Peticao_Inicial_Vale_Azul_Protocolada.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221108021422/https://epbr.com.br/ambientalistas-tentam-barrar-na-justica-projetos-termeletricos-em-macae/. Archived from the original on 08 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20240125100929/http://www.edfnortefluminense.com.br/nf2/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20240125090638/http://licenciamento.ibama.gov.br/Termeletricas/UTE-Norte%20Fluminense%20II/EDFNF2_RIMA_Digital%20%20%20%20%20%20sei%20%207544718.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125090624/https://eurio.com.br/noticia/22553/multinacional-francesa-edf-quer-ampliar-investimentos-no-estado-do-rio.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125090645/https://petroleohoje.editorabrasilenergia.com.br/ibama-autoriza-construcao-da-ute-norte-fluminense-2/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125090745/https://www.rj.gov.br/NoticiaDetalhe.aspx?id_noticia=14524&pl=multinacional-francesa-edf-pretende-ampliar-investimentos-no-estado. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125114728/https://prensadebabel.com.br/ibama-concede-licenca-para-construcao-de-usina-termeletrica-em-macae/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "Comptes Consolidé" (PDF). EDF. December 31, 2020. Archived (PDF) from the original on May 12, 2021. Retrieved May 7, 2021.
- ↑ "Ibama autoriza construção da UTE Norte Fluminense 2". Petroleo Hoje. January 8, 2021. Archived from the original on May 3, 2021. Retrieved May 4, 2021.
- ↑ 13.0 13.1 13.2 "UTE Norte Fluminense 2". EDF Norte Fluminense. Archived from the original on May 3, 2021. Retrieved November 29, 2022.
- ↑ "Usina Termelétrica Norte Fluminense 2: RIMA - Relatório de Impacto Ambiental (pp 20, 24)" (PDF). EDF Norte Fluminense. 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "PORTARIA Nº 937/SPE/MME". Ministério de Minas e Energia/Secretaria de Planejamento e Desenvolvimento Energético. September 14, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Leilões - Agenda e Resultados". CCEE. Retrieved 2022-11-29.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Qualidade do Ar em Macaé (RJ)" (PDF). IEMA. December 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 18.0 18.1 "Ambientalistas tentam barrar na Justiça projetos termelétricos em Macaé". EPBR. November 4, 2022.
Additional data