Nossa Senhora de Fatima power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Nossa Senhora de Fatima power station (Usina Termelétrica Nossa Senhora de Fátima) is a power station in pre-construction in Macaé, Rio de Janeiro, Brazil.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Nossa Senhora de Fatima power station | Macaé, Rio de Janeiro, Brazil | -22.306806, -41.864583 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
1 | Pre-construction[2][1][3][4][5] | fossil gas: LNG[4] | 582[1][4] | combined cycle[6] | not found |
2 | Pre-construction[1][2][4] | fossil gas: LNG[4] | 452[1][4] | combined cycle[6] | not found |
3 | Pre-construction[1][2][4] | fossil gas: LNG[4] | 452[1][4] | combined cycle[6] | not found |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Operator | Owner | Parent |
---|---|---|---|
1 | Usina Termeletrica Nossa Senhora de Fatima[7] | Eneva SA [100%][8][9][4] | Eneva SA [100.0%] |
2 | Usina Termeletrica Nossa Senhora de Fatima[7] | Eneva SA [100%][8][9][4] | Eneva SA [100.0%] |
3 | Usina Termeletrica Nossa Senhora de Fatima[7] | Eneva SA [100%][8][9][4] | Eneva SA [100.0%] |
Background
As of February 2021, Eneva continued to move forward with its plans and authorizations for the power station, including establishing an agreement with BP to supply imported LNG to Nossa Senhora de Fatima.[10] The plant was still in the licensing phase as of March 2021.[11] The project was listed as a participant in Brazil's A-5 national energy auction in September 2021[12] but did not emerge victorious.[13]
Opposition
In November 2022, the Brazilian environmental group Arayara filed a public civil action against Brazil's national environmental authority IBAMA, Rio de Janeiro state environmental authority INEA and four private companies. The filing alleged that the Nossa Senhora de Fátima power station, along with several other proposed power plants, would have a detrimental impact on water supply and air quality in the region, and requested that additional environmental studies be undertaken prior to further development of the power plants.[14]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20221028223959/https://app.powerbi.com/view?r=eyJrIjoiNjc4OGYyYjQtYWM2ZC00YjllLWJlYmEtYzdkNTQ1MTc1NjM2IiwidCI6IjQwZDZmOWI4LWVjYTctNDZhMi05MmQ0LWVhNGU5YzAxNzBlMSIsImMiOjR9. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240125105038/http://siteempresas.bovespa.com.br/DWL/FormDetalheDownload.asp?site=C&prot=733092. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221108021422/https://epbr.com.br/ambientalistas-tentam-barrar-na-justica-projetos-termeletricos-em-macae/. Archived from the original on 08 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 (PDF) https://web.archive.org/web/20240125090740/https://eneva.com.br/wp-content/uploads/sites/2/2022/06/Eneva_Sustainability-Report-2021.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125105108/https://oeco.org.br/wp-content/uploads/2023/01/Peticao_Inicial_Vale_Azul_Protocolada.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 (PDF) https://web.archive.org/web/20240125112321/https://naturalenergia.com.br/wp-content/uploads/2018/05/RIMA.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 https://sigel.aneel.gov.br/portal/home/index.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20240125122547/https://sei.cade.gov.br/sei/modulos/pesquisa/md_pesq_documento_consulta_externa.php?mYbVb954ULaAV-MRKzMwwbd5g_PuAKStTlNgP-jtcH5MdmPeznqYAOxKmGO9r4mCfJlTXxQMN01pTgFwPLudA4TU8C6npFd5A5MCbeekN5BWZVTnle-UVsn-ejY0vVoS&id_orgao_acesso_externo=0. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 (PDF) https://web.archive.org/web/20240125122431/https://vipfiles.valor.com.br/BDEmpresas/605601.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "%". epbr (in português do Brasil). 2021-02-09. Retrieved 2021-09-09.
- ↑ "Macaé se consolida como referência em geração de energia". Prefeitura Municipal de Macaé. March 10, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "PORTARIA Nº 937/SPE/MME". Ministério de Minas e Energia/Secretaria de Planejamento e Desenvolvimento Energético. September 14, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Leilões - Agenda e Resultados". CCEE. Retrieved 2022-11-29.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ambientalistas tentam barrar na Justiça projetos termelétricos em Macaé". EPBR. November 4, 2022.
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.