Utajärvi solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Utajärvi solar farm is a solar photovoltaic (PV) farm in pre-construction in Utajärvi, Finland.

Project Details

Table 1: Phase-level project details for Utajärvi solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
Hietaselkä Announced[1] 60 MWp/dc[1] PV[1] Utajärvi Solarpark Oy [100%][1]
Isosuo Construction[2] 2025 (planned)[3] 80 MWac[3] PV[3] Utajärvi Solarpark Oy [100%][1]
Tunturisuo Pre-construction[4] 2026 (planned)[5] 80 MW[6] Assumed PV Utajärvi Solarpark Oy [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Utajärvi solar farm

Phase Name Location Coordinates (WGS 84)
Hietaselkä Utajärvi, Finland[7] 64.7624, 26.4205 (approximate)[7]
Isosuo Utajärvi, North Ostrobothnia, Finland[2] 64.7042, 26.3357 (exact)[2]
Tunturisuo Tunturisuo, Utajärvi, Finland[8] 64.7040, 26.4326 (approximate)[8]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Utajärvi, Hietaselkä". Skarta. Archived from the original on 2024-03-19. Retrieved 2024-01-08.
  2. 2.0 2.1 2.2 "Aurinkosähkövoimalat kartalla". Aurinkosähkövoimalat. Archived from the original on 2024-03-19. Retrieved 2024-01-08.
  3. 3.0 3.1 3.2 "Utajärvi, Isosuo". Skarta. Archived from the original on 2024-03-19. Retrieved 2024-01-08.
  4. https://www.arctictoday.com/arctic_business/finland-solar-power-plant-skarta/. {{cite web}}: Missing or empty |title= (help)
  5. "Skarta Energy implements Finland's largest solar park to Utajärvi". Skarta. 2023-12-07. Archived from the original on 2024-02-07. Retrieved 2024-01-03.
  6. https://web.archive.org/web/20240201202806/https://energycentral.com/news/fingrid-concludes-first-solar-power-plant-connection-agreement-skarta-energy-%E2%80%93-utaj%C3%A4rvi-project. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://skartaenergy.fi/hankkeet/utajarvi-hietaselka/ https://maps.app.goo.gl/to3VXUHpujUnphQe9, https://skartaenergy.fi/hankkeet/utajarvi-hietaselka/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  8. 8.0 8.1 https://maps.app.goo.gl/RGjG9hbh5rTi8JYJ9 https://skartaenergy.fi/hankkeet/utajarvi-tunturisuo/, https://maps.app.goo.gl/RGjG9hbh5rTi8JYJ9. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)