Uttar Ganga hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Uttar Ganga hydroelectric plant is a hydroelectric power plant in pre-construction in Gam Village, Rolpa District, Rapti Zone, Lumbini Province, Nepal.
Project Details
Table 1: Project details for Uttar Ganga hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Pre-construction[1] | 2031 (planned)[2] | 828 MW[3] | 4 x 101 MW; 4 x 105 MW[3] | Conventional storage[4] | Nepal Electricity Authority (NEA)[3] | Uttar Ganga Power CO LTD[3] |
Location
Table 2: Location details for Uttar Ganga hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Gam Village, Rolpa District, Rapti Zone, Lumbini Province, Nepal[3] | Uttar Ganga River[3] | 28.375, 82.9167 (approximate)[3] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 20 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220817014344/https://www.power-technology.com/marketdata/uttarganga-storage-nepal/. Archived from the original on 17 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 (PDF) https://web.archive.org/web/20220308185930/https://nea.org.np/admin/assets/uploads/supportive_docs/1555390265_Final%20EOI%20Document_PPMO.pdf. Archived from the original (PDF) on 08 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220630164519/https://kathmandupost.com/money/2019/04/18/828-mw-uttar-ganga-hydro-project-revived-after-7-years. Archived from the original on 30 June 2022.
{{cite web}}
: Missing or empty|title=
(help)