Uusiniity solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Ortenoja
Uusiniity solar farm is a solar photovoltaic (PV) farm in pre-construction in Uusiniitty, Pöytyä, Finland.
Project Details
Table 1: Phase-level project details for Uusiniity solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Pre-construction[1] | 2025 (planned)[1] | 40 MWp/dc[1] | PV[1] | Ilmatar Energy Oy [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Uusiniity solar farm
Location | Coordinates (WGS 84) |
---|---|
Uusiniitty, Pöytyä, Finland[1][2] | 60.7187871, 22.6037129 (approximate)[1][2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240207001257/https://ilmatar.fi/en/project/ortenoja/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240207001259/https://www.google.com/maps/place/21870+P%C3%B6yty%C3%A4,+Finland/@60.717714,22.568811,11.78z/data=!4m6!3m5!1s0x468c08aca3310587:0xaf771eb4dbc86bd1!8m2!3d60.7198324!4d22.603693!16zL20vMDNjMjQy?entry=tts. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)