Vergão wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Parque Eólico Vergão

Vergão wind farm is an operating wind farm in Proença a Nova e Peral, Castelo Branco, Portugal.

Project Details

Table 1: Phase-level project details for Vergão wind farm

Phase name Status Commissioning year Retired year Nameplate capacity Type Owner Operator
1 Retired[1] 2003[2] 2017[2] 13 MW[1] Onshore[3] Novenergia [100%][2] Generg[4]
RP1-2018 Operating[2] 2018[1][2] 12 MW[2] Onshore[3] Novenergia [100%][2] Generg[4]

Location

Table 2: Phase-level location details for Vergão wind farm

Phase Name Location Coordinates (WGS 84)
1 Proença a Nova e Peral, Castelo Branco, Portugal[5] 39.7554, -7.9897 (exact)[5]
RP1-2018 Proença a Nova e Peral, Castelo Branco, Portugal[6] 39.7553, -7.9897 (exact)[6]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 (PDF) https://web.archive.org/web/20240126035327/https://www.apren.pt/contents/documents/portugal-parques-eolicos-2018.pdf. Archived from the original (PDF) on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240126035614/https://renewables.totalenergies.com/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://web.archive.org/web/20220630075400/http://e2p.inegi.up.pt/relatorios/Portugal_parques_eolicos_2021.pdf. Archived from the original (PDF) on 30 June 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 (PDF) https://web.archive.org/web/20240131072323/http://www.generg.pt/media/1443/rec2017-generg-sgps.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240201002214/https://www.thewindpower.net/windfarm_en_627.php. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20230103182122/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 03 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)