Versetz hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Versetz hydroelectric plant is a hydroelectric power plant in pre-construction in Gemeinde Kaunertal, Bezirk Landeck, Tyrol, Austria.
Project Details
Table 1: Project details for Versetz hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Pre-construction[1] | 2034 (planned)[2] | 400 MW[2] | 4[2] | Pumped storage[2] | Tiroler Wasserkraft AG (TIWAG)[2] | Tiroler Wasserkraft AG (TIWAG)[3] |
Location
Table 2: Location details for Versetz hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Gemeinde Kaunertal, Bezirk Landeck, Tyrol, Austria[2] | 46.9595, 10.7364 (exact)[2] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20221007091459/https://www.tiwag.at/unternehmen/unsere-kraftwerke/ausbauvorhaben/ausbau-kaunertal/. Archived from the original on 07 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 (PDF) https://web.archive.org/web/20220616195709/https://static1.squarespace.com/static/5c1978d3ee1759dc44fbd8ba/t/5d711742e83c1400017766b8/1567692623480/Kaunertal+Assessment+Report+Feb+2017.pdf. Archived from the original (PDF) on 16 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230121140625/https://www.tiwag.at/unternehmen/unsere-kraftwerke/kraftwerkspark/. Archived from the original on 21 January 2023.
{{cite web}}
: Missing or empty|title=
(help)