Victoria II power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Victoria II power station (Central Térmica Victoria II) is a mothballed power station in Guayaquil, Guayas, Ecuador.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Victoria II power station | Guayaquil, Guayas, Ecuador | -2.266244, -79.861298 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Mothballed[1][2][3][4][5][6][7][8][9] | fossil liquids: naphtha, fossil liquids: diesel[10][11] | 115[12] | gas turbine[10][13] | not found | 2003[14][5] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Intervisatrade SA [100%][10] | Intervisatrade SA [100.0%] |
Background
According to a 2024 document published by Ecuadorian CENACE, the Victoria II power station has not registered any generation for several years, but there aren't any existing documents to eliminate it from the organization's records.[15] The Victoria II barges were seized by the Ecuadorian State in 2016 because, allegedly, they "were being used improperly and without complying with customs formalities."[16] From 2017 to 2024 there have been no records of the plant generating any electricity in CENACE's annual energy generation reports.[17] Thus, as of March 2024, the power plant is considered to be mothballed.
Articles and Resources
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240125123416/https://www.expreso.ec/actualidad/incauta-barcazas-obtiene-indemnizacion-juicio-75086.html. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125134624/https://www.cenace.gob.ec/wp-content/uploads/downloads/2019/06/01.-Parte-1-Informe-Anual-2016.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125134626/https://www.cenace.gob.ec/wp-content/uploads/downloads/2019/06/02.-Parte-2-Informe-Anual-2016.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125134509/https://www.cenace.gob.ec/wp-content/uploads/downloads/2019/06/02.-Parte-2-Informe-Anual-2017.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 (PDF) https://web.archive.org/web/20240125134512/https://www.cenace.gob.ec/wp-content/uploads/downloads/2019/06/02.-Parte-2-Informe-Anual-2018.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125134515/https://www.cenace.gob.ec/wp-content/uploads/downloads/2021/04/Informe-Anual-CENACE-2020-Parte-2.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125134539/https://www.cenace.gob.ec/wp-content/uploads/downloads/2022/07/INFORME-ANUAL-CENACE-2021-PARTE-2.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125134623/https://www.cenace.gob.ec/wp-content/uploads/downloads/2023/04/Parte-2-Informe-Anual-2021.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240520205210/https://www.cenace.gob.ec/wp-content/uploads/downloads/2024/04/Parte-2-Informe-Anual-CENACE-2023.pdf. Archived from the original (PDF) on 20 May 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 (PDF) https://web.archive.org/web/20240125093040/https://bibdigital.epn.edu.ec/bitstream/15000/17329/1/CD-7826.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125133126/https://www.revistaei.cl/2006/11/08/ecuador-se-buscan-recursos-para-importar-energia/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125102223/https://www.controlrecursosyenergia.gob.ec/wp-content/uploads/downloads/2023/03/Atlas-2022_baja.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125102127/https://www.recursosyenergia.gob.ec/wp-content/uploads/2020/01/4.-EXPANSION-DE-LA-GENERACION.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240125115311/https://www.eluniverso.com/2005/10/17/0001/9/BB7AB45862834C388B0F77A9063A66D0.html/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ CENACE (2024). "Informe Anual CENACE 2024 Parte 2" (PDF). CENACE. Retrieved May 16, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "El Estado incauta barcazas y obtiene indemnizacion, en juicio". www.expreso.ec (in español). Retrieved 2024-05-16.
- ↑ CENACE (2017). "Informa Anual CENACE 2017" (PDF). CENACE.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.