Villanueva Eucalyptus Biomass power station
From Global Energy Monitor
This article is part of the Global Bioenergy Power Tracker, a Global Energy Monitor project. |
Villanueva Eucalyptus Biomass power station (Planta de Biomasa Villanueva Eucalipto) is a power station under construction in Colombia.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Villanueva Eucalyptus Biomass power station | Colombia | 4.6121931, -72.9281535 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Status | Fuel(s) | Capacity (MW) | Start year |
---|---|---|---|
Construction[1] | bioenergy: wood & other biomass (solids)[1] | 25[1] | 2025 (planned)[1] |
Table 3: Unit-level ownership and operator details
Owner | Parent |
---|---|
Reforestadora de la Costa SAS; EDF Energy Ltd[1][1] | EDF Energy Holdings Ltd; Reforestadora de la Costa SAS |
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240704202533/https://www.ecopetrol.com.co/wps/portal/Home/es/noticias/detalle/edf-colombia-y-refocosta-construiran-planta-de-biomasa. Archived from the original on 04 July 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of bioenergy power stations, a downloadable dataset, and summary data, please visit the Global Bioenergy Power Tracker on the Global Energy Monitor website.