Vineyard Wind South is a pre-construction wind farm near Edgartown, Dukes County, Massachusetts, United States.
Project Details
Table 1: Phase-level project details for Vineyard Wind South
Phase name | Status | Commissioning year | Nameplate capacity | Mount type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Pre-construction[1] | 2025 (planned)[1] | 804[1] | Offshore hard mount | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][2] | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][1] |
2 | Pre-construction[1] | 2025 (planned)[1] | 1350[1] | Offshore hard mount | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][2] | Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][1] |
Location
Table 2: Phase-level location details for Vineyard Wind South
Phase name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Edgartown, Dukes County, Massachusetts, United States[3] | 41.0471, -70.4874 (approximate)[3] |
2 | West Tisbury, Massachusetts, United States[4][1] | 40.9357, -70.7600 (approximate)[4] |
The map below shows the approximate locations of the wind farm phases:
Background
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf" (PDF). Archived from the original (PDF) on October 7, 2021. Retrieved November 17, 2021.
- ↑ 2.0 2.1 "Partners". Vineyard Wind. Archived from the original on September 15, 2021. Retrieved December 6, 2021.
- ↑ 3.0 3.1 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
- ↑ 4.0 4.1 "www.boem.gov/sites/default/files/documents/renewable-energy/state-activities/Lease-501-534-Visual.pdf" (PDF). Archived from the original (PDF) on October 8, 2021. Retrieved November 17, 2021.