Vineyard Wind South

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: New England Wind, Commonwealth Wind, Park City Wind

Vineyard Wind South is a pre-construction wind farm near Edgartown, Dukes County, Massachusetts, United States.


Project Details

Table 1: Phase-level project details for Vineyard Wind South

Phase name Status Commissioning year Nameplate capacity Mount type Owner Operator
1 Pre-construction[1] 2025 (planned)[1] 804[1] Offshore hard mount Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][2] Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][1]
2 Pre-construction[1] 2025 (planned)[1] 1350[1] Offshore hard mount Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][2] Avangrid Renewables [50%]; Copenhagen Infrastructure Partners (CIP) [50%][1]


Location

Table 2: Phase-level location details for Vineyard Wind South

Phase name Location Coordinates (WGS 84)
1 Edgartown, Dukes County, Massachusetts, United States[3] 41.0471, -70.4874 (approximate)[3]
2 West Tisbury, Massachusetts, United States[4][1] 40.9357, -70.7600 (approximate)[4]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf" (PDF). Archived from the original (PDF) on October 7, 2021. Retrieved November 17, 2021.
  2. 2.0 2.1 "Partners". Vineyard Wind. Archived from the original on September 15, 2021. Retrieved December 6, 2021.
  3. 3.0 3.1 "Form EIA-860 detailed data (v2020 Early Release June, 2021): US Energy Information Administration". US Energy Information Administration. September 5, 2020. Archived from the original on July 13, 2021. Retrieved May 21, 2021.
  4. 4.0 4.1 "www.boem.gov/sites/default/files/documents/renewable-energy/state-activities/Lease-501-534-Visual.pdf" (PDF). Archived from the original (PDF) on October 8, 2021. Retrieved November 17, 2021.