Vodice-Jarše-Novo mesto pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Vodice-Jarše-Novo mesto pipeline is a proposed gas pipeline in Slovenia.
Location
The pipeline runs from Vodice to Jarše District to Grosuplje and then to Novo mesto, Slovenia.[1]
Project Details
- Owner: Plinovodi d.o.o.[1]
- Current capacity:
- Length: 66 km[1]
- Stage one (Vodice − Jarše): 18.4 km
- Diameter: 400 mm[1]
- Status: Proposed[1]
- Start Year:
- Cost: €62.9 million (US$71.7 million)[2]
- Associated Infrastructure:
- ENTSOG Project Code:
Background
Plinovodi lists the project as "A13" and considers it amongst its projects under planning from 2022-2024.[3] The pipeline seems to have been first proposed as early as 2013, when it appeared in the 2013–2022 ten-year development plan.[4]
Although the first phase of the project was expected to be commissioned in 2021, the project has remained in its "conceptual design phase" with no construction having started on the pipeline.[2] However, the plan is featured in Plinivodi's 2022-2031 TYNDP, and is still expected to move forward despite delays.[3]
References
- ↑ 1.0 1.1 1.2 1.3 1.4 Plinovodi d.o.o (November 2018). "TEN-YEAR GAS TRANSMISSION NETWORK DEVELOPMENT PLAN FOR THE 2019 − 2028 PERIOD" (PDF). plinovodi.si. Retrieved August 19, 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 2.2 Plinovodi d.o.o, (February 2021). "TEN-YEAR GAS TRANSMISSION NETWORK DEVELOPMENT PLAN FOR THE 2021 − 2030 PERIOD" (PDF). Plinovodi. Retrieved August 31, 2021.
{{cite web}}
: CS1 maint: extra punctuation (link) CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 Plinovodi d.o.o (April 2021). "DESETLETNI RAZVOJNI NAČRT PRENOSNEGA PLINOVODNEGA OMREŽJA ZA OBDOBJE 2022–2031" (PDF). Plinovodi. Retrieved September 2, 2021.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Ten-Year Network Development Plan 2013-2022" (PDF). ENTSOG. Retrieved 2022-03-07.
{{cite web}}
: CS1 maint: url-status (link)