Winchester South Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Winchester South Coal Mine is a proposed coal mine in Mackay, Queensland, Australia.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Winchester South Coal Mine Mackay, Queensland, Australia -22.1508629, 148.1757381 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Proposed[1] Permitted[2] New 2024[1]

Table 3: Operation details

Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
15[3] Surface Open Pit 160[4] 450

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
530 Bowen Bituminous Met[3]

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Whitehaven WS Pty Ltd[1][5] Whitehaven Coal Ltd [100.0%] Australia, Australia

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

The Winchester South coal project is a proposed coal project in Queensland, Australia.[6] Whitehaven Coal owns in the project. Prior to Whitehaven, Rio Tinto had a 75% interest in Winchester South coal project, with Spectre Group holding a 25% interest.[6].[7] They sold the project to Whitehaven in 2018.

As of June 2020, Whitehaven has lodged an application for a 15 mtpa open cut mine, and are preparing the draft environmental impact statement. They have many steps to go before the project is approved. The company is hoping to bring the mine into production by 2023.[8]

In 2022, the IEA downsized the apparent size of the project to 8.5 million tonnes per annum[9]

  • Sponsor:
  • Parent Company: Whitehaven Coal
  • Location: Located 30km south-east of Moranbah, in Queensland’s well-established Bowen Basin.
  • GPS Coordinates: -22.1508629, 148.1757381 (proposed)
  • Status: Proposed[8]
  • Production Capacity: 17 mtpa run of mine[8] or 8.5 mtpa[9]
  • Total Resource: 530 Mt[10]
  • Mineable Reserves: 130 Mt[10]
  • Coal type: high quality coking coal[8]
  • Mine Size:
  • Mine Depth: 150m (max)
  • Mine Type: Surface, open cut[8]
  • Start Year: 2023[8]
  • Source of Financing:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240718162548/https://www.statedevelopment.qld.gov.au/coordinator-general/assessments-and-approvals/coordinated-projects/completed-projects/winchester-south-project. Archived from the original on 18 July 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240202180033/https://australiainstitute.org.au/coal-mine-tracker/update/queensland-government-approves-winchester-south-coal-mine/. Archived from the original on 02 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 (PDF) https://web.archive.org/web/20240125063611/https://whitehavencoal.com.au/wp-content/uploads/2022/09/Whitehaven_Coal_Annual_Report_2022.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://eisdocs.dsdip.qld.gov.au/Winchester%20South/Draft%20EIS/section-two-project-description.pdf. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://web.archive.org/web/20230313091848/https://whitehavencoal.com.au/wp-content/uploads/2021/08/01-Permit-Application-ML700049.pdf. Archived from the original (PDF) on 13 March 2023. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 "Whitehaven to acquire Winchester South Project from Rio Tinto," "Whitehaven Coal," March 22, 2018.
  7. Rio Tinto, 2009 Annual Report: Mineral resources", Rio Tinto, 2010.
  8. 8.0 8.1 8.2 8.3 8.4 8.5 "Winchester South Project," "Whitehaven Coal website," accessed June 2020.
  9. 9.0 9.1 Coal 2022, IEA, accessed 2022
  10. 10.0 10.1 "Winchester South Project," "Mining Data Solutions," accessed June 2020.