Xiantao power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Xiantao power station (华润电力仙桃发电厂) is an operating power station of at least 1320-megawatts (MW) in Changtangkou Town Zengjiatai Villege, Xiantao, Hubei, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Xiantao power station Changtangkou Town Zengjiatai Villege, Xiantao, Hubei, China 30.371957, 113.567148 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase II Unit 3, Phase II Unit 4, Unit 1, Unit 2: 30.371957, 113.567148

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase II Unit 3 permitted[1] coal: unknown 660[2] ultra-supercritical[2]
Phase II Unit 4 permitted[1] coal: unknown 660[1] ultra-supercritical[1]
Unit 1 operating coal: unknown 660 ultra-supercritical 2022
Unit 2 operating coal: unknown 660 ultra-supercritical 2022

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase II Unit 3 China Resources Power (Xiantao) Co Ltd [100%] China Resources Power Holdings Co Ltd [100.0%]
Phase II Unit 4 China Resources Power (Xiantao) Co Ltd [100%] China Resources Power Holdings Co Ltd [100.0%]
Unit 1 China Resources Power (Xiantao) Co Ltd [100%] China Resources Power Holdings Co Ltd [100.0%]
Unit 2 China Resources Power (Xiantao) Co Ltd [100%] China Resources Power Holdings Co Ltd [100.0%]

Project-level coal details

Background on Project

In 2015 China Resources Holding was permitted to build a 2 x 660 MW coal-fired power station in the city of Xiantao.[3][4]

The project was planned for completion in 2017,[5][6] but construction did not begin until March 2019.[7]

Unit 1 was connected to the grid by the end of June 2022,[8] and began operating July 10, 2022.[9]

Unit was connected to the grid on October 22, 2022,[10] and was operating by November 2022.[11]

In December 2022, a 2 x 660 MW Phase II expansion was announced at Xiantao power station.[12] In October 2023, Environmental Impact Assessment information was made available.[13] In November 2023, Phase II was reportedly preparing to start construction.[14]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 https://hbj.xiantao.gov.cn/xwzx/gsgg/202310/t20231031_4920940.shtml. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125143225/https://news.bjx.com.cn/html/20231120/1344489.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. "华润电力拟建湖北仙桃火电项目", BJX News, 2012-12-10
  4. "省发改委关于华润仙桃电厂新建工程项目核准的通知,” DRC of Hubei Province, 2015-10-16
  5. "湖北省2014-2015年大型火电项目建设选优评议结果公示," 能源局电力处, 2014-06-27
  6. "总投资51亿元 湖北华润仙桃电厂试桩开机"湖北日报, 2016/1/11
  7. "华润电力仙桃电厂新建2×660MW燃煤机组工程主体建筑开工," 河南省第二建筑工程发展有限公司, 2019/3/13
  8. 华润仙桃电厂2×660MW燃煤机组工程1号机组首次并网一次成功, china5e, 2022-06-27
  9. "仙桃电厂1号机组顺利通过168试运," CR Power, 2022-07-17
  10. "华润仙桃电厂2×660MW超超临界燃煤机组工程2号机组首次并网一次成功," BJX, 2022-10-20
  11. "2×660MW!湖北仙桃电厂项目实现“双投”," BJX, 2022-11-11
  12. 华润电力仙桃电厂——一期投产发电,二期稳步推进 news.hubeidaily.net, December 26, 2022
  13. 华润电力(仙桃)有限公司二期2×660MW超超临界燃煤发电机组工程环境影响评价信息公告-仙桃市人民政府 hbj.xiantao.gov, October 31, 2023
  14. 计划投资53亿元!华润仙桃火电二期项目即将开工 news.bjx.com, November 20, 2023

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.