Xinjiang Bole Border Cooperation Zone Integrated solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: 新疆新能集团有限责任公司博乐市源网荷储一体化示范项目
Xinjiang Bole Border Cooperation Zone Integrated solar farm is a solar photovoltaic (PV) farm under construction in Bole City, Bortala AP, Xinjiang, China.
Project Details
Table 1: Phase-level project details for Xinjiang Bole Border Cooperation Zone Integrated solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Construction[1] | 150 MW[2] | PV[2] | Xinjiang Electric Power Hotel [100%] (新疆电力宾馆)[3] | Xinjiang Xinneng Group CO LTD (新疆新能集团有限责任公司)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Xinjiang Bole Border Cooperation Zone Integrated solar farm
Location | Coordinates (WGS 84) |
---|---|
Bole City, Bortala AP, Xinjiang, China[1] | 45.1942, 82.5645 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20220419092744/http://www.xjbl.gov.cn/info/1017/74555.htm.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20220813212915/https://guangfu.bjx.com.cn/news/20220801/1245165.shtml.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220907171702/https://www.qcc.com/weblogin?back=%2Ffirm%2F37bb0e08524f0c85eed11f792a0beca3.html. Archived from the original on 07 September 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)