Xuan Thien Nam Dinh steel plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Xuan Thien Nam Dinh steel plant is a steel plant in Nam Dinh, Vietnam that operates direct reduced iron (DRI) and electric arc furnace (EAF) technology.
Location
The map below shows the approximate location of the plant in Nam Dinh, Vietnam:
- Location: Nam Dinh, Nam Dinh Province, Vietnam
- Coordinates (WGS 84): 20.439025, 106.162134 (approximate)
Background
In 2021, the approval for the setting up Xuan Thien Nam Dinh factory was passed. The Xuan Thien Nam Dinh No. 1 steel factory will be built in three phases of 36 months, 48 months and 60 months, respectively to reach a total capacity of 7,500 ttpa.[1]
Plant Details
Table 1: General Plant Details
Announced date | Start date | Power source |
---|---|---|
2021[2] | 2028[3] | Plans wind power for EAF[4] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
Xuan Thien Group JSC | 5076694862 | E100000134775 | Xuan Thien Group JSC[5] | 5076694862 | E100000134775 |
Table 3: Process and Products
ISO 14001 | ISO 50001 | Main production equipment |
---|---|---|
unknown | unknown | DRI; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
announced | 7500[6] | 7500[6] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|
announced | 0[6] | 0[6] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel | Sinter | Coke | Pellets |
---|---|---|---|
NF | NF | NF | NF |
Unit Details
Table 7: Direct Reduced Iron Furnace Details
Unit name | Status | Announced date | Start date | Furnace type | Current capacity (ttpa) |
---|---|---|---|---|---|
unknown DRI (1) | announced[4] | 2021[2] | 2025[2][7] | not found | 0[6] |
unknown DRI (2) | announced[4] | 2021[2] | 2028[3] | not found | 0[6] |
unknown DRI (3) | announced[4] | 2021[2] | 2029[3] | not found | 0[6] |
Table 8: Electric Arc Furnace Details
Unit name | Status | Announced date | Start date | Current capacity (ttpa) |
---|---|---|---|---|
unknown EAF (1) | announced[6][2] | 2021[2] | 2028[3] | 2500[6] |
unknown EAF (2) | announced[6][2] | 2021[2] | 2029[3] | 2500[6] |
unknown EAF (3) | announced[6][2] | 2021[2] | 2030[3] | 2500[6] |
Table 9: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based | % scrap | % DRI |
---|---|---|---|
unknown EAF (1) | yes[4] | >0[4] | >0[4] |
unknown EAF (2) | yes[4] | >0[4] | >0[4] |
unknown EAF (3) | yes[4] | >0[4] | >0[4] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs named:0
- ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 https://web.archive.org/web/20241213084039/https://theinvestor.vn/4-bln-steel-complex-breaks-ground-in-nam-dinh-province-d2539.html. Archived from the original on 13 December 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20240905155143/https://ppl.com.vn/en/news/nam-dinh-proposes-to-build-a-port-of-35000-billion-vnd.html. Archived from the original on 2024-09-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 https://web.archive.org/web/20240905174539/https://www.seaisi.org/details/22900?type=news-rooms. Archived from the original on 2024-09-05.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://xuanthiengroup.vn/about-us-art189/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 https://web.archive.org/web/20240913172830/https://www.steelradar.com/en/haber/weak-market-in-vietnam-slows-xuan-thien-green-steel-project/. Archived from the original on 2024-09-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230402055634/https://nghiahung.namdinh.gov.vn/kinh-te-chinh-tri/le-khoi-cong-du-an-nha-may-san-xuat-cau-kien-be-tong-duc-san-thuoc-to-hop-thep-xanh-xuan-thien-n-241522. Archived from the original on 2023-04-02.
{{cite web}}
: Missing or empty|title=
(help)