Yangjiang LNG Terminal
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Yangjiang LNG Terminal (阳江LNG调峰储气库) is an LNG terminal under construction in Yangjiang, Guangdong, China.
Location
Project details
- Owner: Guangdong Yangjiang Hailingwan LNG Co.,Ltd. 广东阳江海陵湾液化天然气有限责任公司[1]
- Parent company: Pacific Energy Co., Ltd. 50%, Guangdong Energy Group Natural Gas Co., Ltd. 50%
太平洋能源有限公司 | 50% |
广东能源集团天然气有限公司 | 50% |
- Location: Yangjiang, Guangdong, China
- Coordinates: 21.66730589532405, 111.83466723787859 (exact)
- Capacity: 2.8 mtpa
- Status: Construction[2]
- Type: Import
- Cost: 4.5 billion RMB[3]
- Start year: 2023
Background
The project was announced in September 2018 as a joint venture between Yudean and Royal Golden Eagle.[3] The construction and land reclamation from the sea began in February 2018. The estimated investment was 4.5 billion yuan ($685 million).[3]
A ground breaking ceremony was held in August 2019. The receiving capacity was reportedly 2.8 mtpa.[4][5]
The construction reportedly began in September 2021. The operating date is set at the beginning of 2024.[6]
By October 2022, the construction is ongoing. [6]
As of February 2024, no news about the operation is available.
Articles and resources
References
- ↑ "广东阳江海陵湾液化天然气有限责任公司-企查查". www.qcc.com. Retrieved 2021-03-31.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "阳江LNG调峰储气库项目加快推进 配套码头主体结构基本完成--羊城派 广东羊城晚报数字媒体有限公司官方账号". new.qq.com. 2023-07-12.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 粤电集团主导首个LNG接收站开工,定位“来料加工”全面对外开放, news.qq.com, Sep. 2, 2018
- ↑ "金鹰集团助力中国天然气资源供应-新闻-能源资讯-中国能源网". www.china5e.com. Retrieved 2021-03-31.
- ↑ "阳江 LNG 调峰储气库项目举行奠基仪式" (PDF). www.rgei.com/. 2019-08-28.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 6.0 6.1 "16万立方!阳江LNG调峰储气项目储罐主体结构即将完成--阳江广播电视台". m.yjtvw.com. 2022-10-10.
{{cite web}}
: CS1 maint: url-status (link)