Yokohama Trunk Line

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Yokohama Trunk Line is an operating natural gas pipeline in Japan.[1]

Location

The second phase of the pipeline runs between Aoba Ward, Yokohama City and Aso Ward, Kawasaki City, ‎Kanagawa, Japan. [2]

Loading map...

Project Details

  • Operator: Tokyo Gas
  • Owner: Tokyo Gas
  • Parent Company: Tokyo Gas
  • Capacity:
  • Length:
    • First Phase:
    • Second Phase: 6.3 km[3]
  • Diameter:
  • Status: Operating
  • Start Year:
    • First Phase: 1999[4][5]
    • Second Phase: 2013[6]
  • Cost:
  • Financing:
  • Associated Infrastructure:

Background

The second phase of the pipeline has a diameter 750 mm and operates at a pressure of 3.0 MPa. Tokyo gas invested 7.7 billion yen into the pipeline.[2]

Articles and resources

References

  1. The Ins and Outs of Growth, Tokyo Gas, February 2019
  2. 2.0 2.1 Tokyo Gas Co., Ltd. (March 2008). "FY2008: Outline of supply plans" (PDF). Tokyo-Gas. Retrieved 12 February 2020.{{cite web}}: CS1 maint: url-status (link)
  3. [https://www.tokyo-gas.co.jp/Press/20130730-02.html "幹線パイプライン「横浜幹線Ⅱ期」の建設工事完了について," Tokyo Gas, July 30, 2013
  4. [https://www.tokyo-gas.co.jp/IR/library/pdf/anual/1402.pdf "Tokyo Gas Annual Report 2014-東京ガスの基礎情報," Tokyo Gas, 2014
  5. Tokyo Gas (2001). "Annual Report 2001: Building a More Powerful Supply Infrastructure and Strengthening Procurement" (PDF). Tokyo-Gas. Retrieved 12 February 2020.{{cite web}}: CS1 maint: url-status (link)
  6. [https://www.tokyo-gas.co.jp/Press/20130730-02.html "幹線パイプライン「横浜幹線Ⅱ期」の建設工事完了について," Tokyo Gas, July 30, 2013

Related GEM.wiki articles

External resources

External articles