Yokohama Trunk Line
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Yokohama Trunk Line is an operating natural gas pipeline in Japan.[1]
Location
The second phase of the pipeline runs between Aoba Ward, Yokohama City and Aso Ward, Kawasaki City, Kanagawa, Japan. [2]
Project Details
- Operator: Tokyo Gas
- Owner: Tokyo Gas
- Parent Company: Tokyo Gas
- Capacity:
- Length:
- First Phase:
- Second Phase: 6.3 km[3]
- Diameter:
- Status: Operating
- Start Year:
- Cost:
- Financing:
- Associated Infrastructure:
Background
The second phase of the pipeline has a diameter 750 mm and operates at a pressure of 3.0 MPa. Tokyo gas invested 7.7 billion yen into the pipeline.[2]
Articles and resources
References
- ↑ The Ins and Outs of Growth, Tokyo Gas, February 2019
- ↑ 2.0 2.1 Tokyo Gas Co., Ltd. (March 2008). "FY2008: Outline of supply plans" (PDF). Tokyo-Gas. Retrieved 12 February 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ [https://www.tokyo-gas.co.jp/Press/20130730-02.html "幹線パイプライン「横浜幹線Ⅱ期」の建設工事完了について," Tokyo Gas, July 30, 2013
- ↑ [https://www.tokyo-gas.co.jp/IR/library/pdf/anual/1402.pdf "Tokyo Gas Annual Report 2014-東京ガスの基礎情報," Tokyo Gas, 2014
- ↑ Tokyo Gas (2001). "Annual Report 2001: Building a More Powerful Supply Infrastructure and Strengthening Procurement" (PDF). Tokyo-Gas. Retrieved 12 February 2020.
{{cite web}}
: CS1 maint: url-status (link) - ↑ [https://www.tokyo-gas.co.jp/Press/20130730-02.html "幹線パイプライン「横浜幹線Ⅱ期」の建設工事完了について," Tokyo Gas, July 30, 2013