Yunnan Qujing Iron and Steel Group Yanggang Iron and Steel Co Ltd

From Global Energy Monitor
This article is part of the
Global Steel Plant Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Yunnan Qujing Iron and Steel Group Yanggang Iron and Steel Co Ltd (云南曲靖钢铁集团扬钢钢铁有限责任公司) is a blast furnace-basic oxygen furnace (BF-BOF) steel plant under construction in Qujing, Yunnan, China.

Location

The map below shows the exact location of the plant in Qujing, Yunnan, China:

Loading map...
  • Location: Yuezhou Town, Qilin District, Qujing City, Yunnan Province
  • Coordinates (WGS 84): 25.308777, 103.876391 (exact)

Background

In April 2021, Jiangsu Qinyou Iron and Steel Group acquired Yuegang Company and established Yunnan Qujing Iron and Steel Group Yanggang Iron and Steel Co., Ltd., which was responsible for the construction of the “1×1580m3 blast furnace, 1×1200m3 blast furnace, 1×120t converter” project.[1]

Plant Details

Table 1: General Plant Details

Plant status Announced date Construction date Start date Workforce size
Construction[2] 2018[3][4] 2021[2] 2023[4] 735[5]

Table 2: Ownership and Parent Company Information

Parent company Parent company GEM ID Owner Owner company GEM ID
Yunan Qujing Shuangyou Steel Co Ltd [25.0%]; Yunnan Qujing Chenggang Iron and Steel (Group) Co Ltd [25.0%]; Fujian XINPENG Investment Co Ltd [16.6%]; Xuanwei Laibin Fenghuang Steel Co Ltd [16.0%]; Qujing Julida Steel Co Ltd [8.0%]; Qujing Wuyue New Energy Technology Co Ltd [5.5%]; Yunnan Tongyanbao Trading Co Ltd [1.7%]; other [1.0%]; Yunnan Qujing Yaochang Trade Co Ltd [0.9%]; Qujing Botong Trading Co Ltd [0.4%] E100000123261 [99%]; E100000001753 [1%] Yunnan Qujing Iron and Steel Group Yanggang Iron and Steel Co., Ltd.[5] E100000126775

Table 3: Process and Products

Main production equipment Detailed production equipment
BF, BOF[4] 1 BOF (1x120-tonne)[4]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Basic oxygen furnace steelmaking capacity Nominal crude steel capacity (total)
construction 1400 TTPA[4] 1400 TTPA[4]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
construction 2500 TTPA[4][4] 2500 TTPA[4][4]

Blast Furnace Details

Table 6: Blast Furnace Details

Unit name Status Announced date Construction date Start date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
unknown construction[2] 2018[3] 2021[2] 2023[4] 1200 m³[4] 1130[4] unknown unknown
unknown construction[2] 2018[3] 2021[2] 2023[4] 1580 m³[4] 1370[4] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 关于云南曲靖钢铁集团越钢钢铁有限公司建设项目企业名称变更的情况说明,云南省工业和信息化厅, October 27, 2021]
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20230927155935/https://baijiahao.baidu.com/s?id=1700267997091402221&wfr=spider&for=pc. Archived from the original on 27 September 2023. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20230927155753/https://www.sohu.com/a/500362518_649931. Archived from the original on 27 September 2023. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 https://web.archive.org/web/20220318090354/https://info.lgmi.com/html/202110/28/1603.htm. Archived from the original on 18 March 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://www.qcc.com/firm/66475a63d48af164558f719210536c47.html. {{cite web}}: Missing or empty |title= (help)

Resources