Yunusabad power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Yunusabad power station (электростанция 4-го теплоцентра в Юнусабадском районе) is an announced power station in Tashkent, Yunusabad, Uzbekistan.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Yunusabad power station | Tashkent, Yunusabad, Uzbekistan | 41.368528, 69.259064 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1: 41.368528, 69.259064
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
1 | Announced[1] | fossil gas: natural gas[1] | 103.2[1] | ICCC[1] | not found |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Thermal Power Stations JSC[1] | Thermal Power Stations JSC |
Background
In June 2023, Thermal Power Stations JSC and Italian credit agency "SACE” signed an agreement for the construction of 24 gas piston units on the territory of the 4th heating center in the Yunusabad district of Tashkent with a capacity of 4.3 MW each and 4 hot water boilers with a capacity of 130 MW each. The project is aimed at implementing the Resolution of the Cabinet of Ministers No. 13 “On improving the activities of district heating enterprises in the city of Tashkent” released in January 2023.[2] As of November 2024, there have not been any updates about the project.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20230610021118/https://minenergy.uz/ru/news/view/2899. Archived from the original on 10 June 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ ""Thermal Power Plants" JSC and the credit agency "SACE" jointly implement a new promising project". Invest in Uzbrkistan. June 9, 2023. Retrieved November 19, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.