Yuqorichirchiq (ACWA Power) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Yuqorichirchiq (ACWA Power) solar farm is an announced solar photovoltaic (PV) farm in Yuqorichirchiq district, Tashkent region, Uzbekistan.

Project Details

Table 1: Phase-level project details for Yuqorichirchiq (ACWA Power) solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Announced[1] 2023 (planned)[2] 100 MW[1] PV[1] ACWA Power Co [100%][1]
2 Announced[3] 300 MW[3] PV[3] ACWA Power Co [100%][3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Yuqorichirchiq (ACWA Power) solar farm

Phase Name Location Coordinates (WGS 84)
1 Yuqorichirchiq district, Tashkent region, Uzbekistan[1] 41.1908, 69.5261 (approximate)[1]
2 Yuqorichirchiq district, Tashkent region, Uzbekistan[1] 41.1908, 69.5261 (approximate)[1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20240201145223/https://lex.uz/ru/docs/6497383. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240201145206/https://lex.uz/ru/docs/6404915. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240201145226/https://www.gazeta.uz/ru/2023/03/17/electricity/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)