Zamora-Mulas solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Zamora-Mulas solar farm is a solar photovoltaic (PV) farm in pre-construction in Zamora, Castile and León, Spain.
Project Details
Table 1: Phase-level project details for Zamora-Mulas solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 29 MW[2] | PV[3] | Opdenergy SA [100%][3] | Opdenergy[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Zamora-Mulas solar farm
Location | Coordinates (WGS 84) |
---|---|
Zamora, Zamora, Castile and León, Spain[3] | 41.5066, -5.7451 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.pv-magazine.es/2023/07/19/opdenergy-cierra-con-banco-santander-128-millones-de-euros-para-financiar-216-mw-en-espana/ https://opdenergy.com/2023/01/26/opdenergy-anuncia-la-consecucion-de-23gw-de-permisos-medioambientales-en-espana-antes-del-cumplimiento-del-hito-del-25-de-enero/, https://www.pv-magazine.es/2023/07/19/opdenergy-cierra-con-banco-santander-128-millones-de-euros-para-financiar-216-mw-en-espana/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://opdenergy.com/2023/01/26/opdenergy-anuncia-la-consecucion-de-23gw-de-permisos-medioambientales-en-espana-antes-del-cumplimiento-del-hito-del-25-de-enero/ https://www.pv-magazine.es/2023/07/19/opdenergy-cierra-con-banco-santander-128-millones-de-euros-para-financiar-216-mw-en-espana/, https://opdenergy.com/2023/01/26/opdenergy-anuncia-la-consecucion-de-23gw-de-permisos-medioambientales-en-espana-antes-del-cumplimiento-del-hito-del-25-de-enero/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240201222005/https://opdenergy.com/2023/01/26/opdenergy-anuncia-la-consecucion-de-23gw-de-permisos-medioambientales-en-espana-antes-del-cumplimiento-del-hito-del-25-de-enero/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)