Zhangping power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Zhangping power station (华电漳平发电厂) is an operating power station of at least 600-megawatts (MW) in Jingcheng, Zhangping, Longyan, Fujian, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Zhangping power station | Jingcheng, Zhangping, Longyan, Fujian, China | 25.28422, 117.39892 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 3, Phase I Unit 4, Phase II Unit 5, Phase II Unit 6, Phase III Unit 7, Phase III Unit 8: 25.28422, 117.39892
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 3 | retired | coal: anthracite | 100 | subcritical | 1986 | 2009 |
Phase I Unit 4 | retired | coal: anthracite | 100 | subcritical | 1987 | 2009 |
Phase II Unit 5 | retired | coal: anthracite | 100 | subcritical | 1994 | 2009 |
Phase II Unit 6 | retired | coal: anthracite | 100 | subcritical | 1994 | 2009 |
Phase III Unit 7 | operating | coal: anthracite | 300 | subcritical | 2011 | – |
Phase III Unit 8 | operating | coal: anthracite | 300 | subcritical | 2012 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 3 | Fujian Huadian Zhangping Thermal Power Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Phase I Unit 4 | Fujian Huadian Zhangping Thermal Power Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Phase II Unit 5 | Fujian Huadian Zhangping Thermal Power Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Phase II Unit 6 | Fujian Huadian Zhangping Thermal Power Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Phase III Unit 7 | Fujian Huadian Zhangping Thermal Power Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Phase III Unit 8 | Fujian Huadian Zhangping Thermal Power Co Ltd [100%] | China Huadian Group Corp [100.0%] |
Background
Zhangping power station was founded in 1985. The first phase of 2 units with 100MW each were brought online in 1986 and 1987. The second phase was completed in 1994, adding two units with 100MW each to the power plant. The 4 units were shut down before 2008, to meet the requirement for developing additional 2 units. The unit 5 and 6, known as phase III, totaling 600 MW, received the permit for construction from NDRC in 2009, and were completed in 2011 and 2012. The plant is owned by China Huadian.[1][2][3] In 2017, the power station received the permit from Fujian Provincial DRC to upgrade the two 300MW units to CHP units, supplying heat to the Zhangping Industrial Park besides generating electricity. [4]
Articles and Resources
References
- ↑ 福建华电漳平电厂, Baike.com Wiki, accessed Oct. 2014.
- ↑ "福建华电漳平火电有限公司"PowerQQ
- ↑ "福建华电漳平火电有限公司2×300MW工程获国家发改委核准"北极星电力网新闻中心, 2009-7-1
- ↑ "福建省发展和改革委员会关于福建华电漳平火电有限公司2×300MW机组供热改造项目核准的复函"福建省发展和改革委员会,2017-1-16
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.