Zhejiang Energy Liuheng LNG Terminal

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Zhejiang Energy Liuheng LNG Terminal (浙能舟山六横LNG接收站) is a proposed LNG terminal in Zhoushan, Zhejiang, China.

Location

Loading map...
浙能舟山六横LNG项目俯瞰图.png

Project details

Phase 1

  • Owner: Zhejiang Energy Liuheng LNG Co., Ltd. 浙江浙能六横液化天然气有限公司[1]
  • Parent company: Zhejiang Energy and Natural Gas Group Co., Ltd. 46%, Shenzhen Energy and Gas Investment Holding Co., Ltd.26.4%, Shenzhen Energy Group Co., Ltd. 17.6%, Zhoushan Putuo District Liuheng Tidal Flat Reclamation Development Co., Ltd. 10%.
浙江能源天然气集团有限公司 46%
深圳能源燃气投资控股有限公司 26.4%
深圳能源集团股份有限公司 17.6%
舟山市普陀区六横滩涂围垦开发有限公司 10%
  • Location: Liuheng Island, Zhoushan, Zhejiang, China (中国浙江省舟山市六横小郭巨地块)
  • Coordinates: 29.712312843844405, 122.06876153074113 (exact)
  • Capacity: 6 mtpa
  • Status: Construction[2]
  • Type: Import
  • Cost: 9.5 billion RMB
  • Start year: 2025

Phase 2

  • Owner: Zhejiang Energy Liuheng LNG Co., Ltd. 浙江浙能六横液化天然气有限公司[1]
  • Parent company: Zhejiang Energy and Natural Gas Group Co., Ltd. 46%, Shenzhen Energy and Gas Investment Holding Co., Ltd.26.4%, Shenzhen Energy Group Co., Ltd. 17.6%, Zhoushan Putuo District Liuheng Tidal Flat Reclamation Development Co., Ltd. 10%.
  • Location: Liuheng Island, Zhoushan, Zhejiang, China
  • Coordinates: 29.711929, 122.083224 (exact)
  • Capacity: 5 mtpa
  • Status: Proposed
  • Type: Import
  • Start year:

Background

In May 2019 an agreement to build the terminal was signed by Zhoushan New District Liuheng Management Committee, Zhejiang Energy Group and Shenzhen Energy Gas Investment Holding Co., Ltd.[3]

The first phase will have the receiving capacity of 5 mtpa, with three storage tanks of 200,000 cubic meters each. The investment of the first phase is estimated at 7.5 billion yuan ($11.51 billion). The second phase plans to add another 5 mtpa of receiving capacity to the LNG terminal. [4][5]

The land use of the LNG terminal was secured in Oct 2020. The purchase price was 398 million yuan ($61 million)[6]

In December 2022, Zhejiang Energy Liuheng LNG terminal received permit for construction from National Development and Reform Commission (NDRC). The permitted capacity is 6.35 million tonnes per year, with four storage tanks of 220,000 cubic meters each. The total investment is about 9.46 billion yuan ($1.4 billion).[7][8]The location is next to Sinopec Liuheng LNG Terminal.[9]

The construction of the first phase began in November 2023. The total investment in the first phase is about 9.45 billion. It includes a jetty for 150,000-ton LNG ships, four 220,000-cubic-meter storage tanks and corresponding process facilities.[2]

一期总投资约94.5亿,规划建设一座15万吨级LNG船舶专用码头,4座22万方储罐及相应工艺设施。[2]

Articles and resources

References

  1. 1.0 1.1 "浙江浙能六横液化天然气有限公司 - 企查查". www.qcc.com. Retrieved 2021-04-20.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 "浙能舟山六横液化天然气接收站工程开工建设-北极星电力新闻网--2023-11-09 11:05 来源: 浙江省发改委". m.bjx.com.cn. 2023-11-09 11:05. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  3. 强强联手 六横管委会与浙能天然气、深能燃气签订《舟山六横液化天然气(LNG)接收站项目合作框架协议》 Sohu News, 05-17-2019
  4. 浙能和深能160亿入局 舟山六横LNG接收站项目合作框架协议签订 来源:华气能源猎头, 05-18-2019
  5. 浙能六横LNG接收站项目前期工作稳步推进 Source: Zhoushan Daily, 11-18-2019
  6. 浙能六横LNG接收站项目顺利完成土地摘牌 10-27-2020.
  7. "浙能舟山六横LNG接收站项目获国家发改委核准-北极星能源网". news.bjx.com.cn. 2022-12-27.{{cite web}}: CS1 maint: url-status (link)
  8. "六横液化天然气接收站项目获国家发改委核准--舟山市发展和改革委员会". 2022- 12- 22. {{cite web}}: Check date values in: |date= (help)CS1 maint: url-status (link)
  9. "浙江日报丨两个百亿级LNG接收站项目获核准批复 普陀加快打造低碳能源海岛样板". zj.zjol.com.cn. 2022-12-18.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles