Zhejiang Yuyao (Shutai) Fishery solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Zhejiang Yuyao (Shutai) Fishery solar farm is a solar photovoltaic (PV) farm in pre-construction in Yuyao City, Ningbo, Zhejiang, China.
Project Details
Table 1: Phase-level project details for Zhejiang Yuyao (Shutai) Fishery solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 300 MWp/dc[2] | PV[2] | Hangzhou Fengling Power Technology CO LTD [40%]; Hangzhou Fulite Plastic Development CO LTD [30%]; Zhejiang Chint New Energy Development CO LTD [30%] (浙江正泰新能源开发有限公司; 杭州福莱特塑料开发有限公司; 杭州风凌电力科技有限公司)[3][3][3] | Yuyao Shutai New Energy CO LTD (余姚舒泰新能源有限公司)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Zhejiang Yuyao (Shutai) Fishery solar farm
Location | Coordinates (WGS 84) |
---|---|
Yuyao City, Ningbo, Zhejiang, China[2] | 29.8622, 121.6204 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ nan
- ↑ 2.0 2.1 2.2 2.3 2.4 (PDF) https://web.archive.org/web/20220523170924/http://zfxxgk.nea.gov.cn/139172930_15933339867741n.pdf (PDF).
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 https://web.archive.org/web/20220713180107/https://www.qcc.com/weblogin?back=%2Ffirm%2F6b1f8d7cb99d83ffaaf5ed301477cf74.html. Archived from the original on 13 July 2022.
{{cite web}}
: Missing or empty|title=
(help)