Zhejiang Zhenhai power station (浙能镇海发电厂) is an operating power station of at least 1320-megawatts (MW) in Niluoshan, Zhenhai, Ningbo, Zhejiang, China with multiple units, some of which are not currently operating. It is also known as 浙能镇海发电厂异地搬迁项目 (Phase II Unit 1, Phase II Unit 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Zhejiang Zhenhai power station Niluoshan, Zhenhai, Ningbo, Zhejiang, China 30.046415, 121.655241 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase II Unit 1, Phase II Unit 2: 30.046415, 121.655241
  • Phase I Unit 3, Phase I Unit 4, Phase I Unit 5, Phase I Unit 6: 29.9440096, 121.6881219

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 3 retired coal: unknown 215 subcritical 1985 2018
Phase I Unit 4 retired coal: unknown 215 subcritical 1987 2018
Phase I Unit 5 retired coal: unknown 215 subcritical 1989 2020
Phase I Unit 6 retired coal: unknown 215 subcritical 1990 2020
Phase II Unit 1 operating coal: unknown 660 ultra-supercritical 2020
Phase II Unit 2 operating coal: unknown 660 ultra-supercritical 2020

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 3 Zhejiang Zheneng Zhenhai Power Generation Co Ltd [100%] Zhejiang Zheneng Electric Power Co Ltd [51.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.6%]; Ningbo Development & Investment Group Co Ltd [10.5%]; Jinneng Group Co Ltd [8.1%]; other [5.4%]; Jinneng Holding Group Co Ltd [2.4%]; Zhejiang Financial Development Co Ltd [1.0%]
Phase I Unit 4 Zhejiang Zheneng Zhenhai Power Generation Co Ltd [100%] Zhejiang Zheneng Electric Power Co Ltd [51.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.6%]; Ningbo Development & Investment Group Co Ltd [10.5%]; Jinneng Group Co Ltd [8.1%]; other [5.4%]; Jinneng Holding Group Co Ltd [2.4%]; Zhejiang Financial Development Co Ltd [1.0%]
Phase I Unit 5 Zhejiang Zheneng Zhenhai Power Generation Co Ltd [100%] Zhejiang Zheneng Electric Power Co Ltd [51.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.6%]; Ningbo Development & Investment Group Co Ltd [10.5%]; Jinneng Group Co Ltd [8.1%]; other [5.4%]; Jinneng Holding Group Co Ltd [2.4%]; Zhejiang Financial Development Co Ltd [1.0%]
Phase I Unit 6 Zhejiang Zheneng Zhenhai Power Generation Co Ltd [100%] Zhejiang Zheneng Electric Power Co Ltd [51.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.6%]; Ningbo Development & Investment Group Co Ltd [10.5%]; Jinneng Group Co Ltd [8.1%]; other [5.4%]; Jinneng Holding Group Co Ltd [2.4%]; Zhejiang Financial Development Co Ltd [1.0%]
Phase II Unit 1 Zhejiang Zheneng Zhenhai Power Generation Co Ltd [100%] Zhejiang Zheneng Electric Power Co Ltd [51.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.6%]; Ningbo Development & Investment Group Co Ltd [10.5%]; Jinneng Group Co Ltd [8.1%]; other [5.4%]; Jinneng Holding Group Co Ltd [2.4%]; Zhejiang Financial Development Co Ltd [1.0%]
Phase II Unit 2 Zhejiang Zheneng Zhenhai Power Generation Co Ltd [100%] Zhejiang Zheneng Electric Power Co Ltd [51.0%]; Shanxi State-Owned Capital Investment and Operation Co Ltd [21.6%]; Ningbo Development & Investment Group Co Ltd [10.5%]; Jinneng Group Co Ltd [8.1%]; other [5.4%]; Jinneng Holding Group Co Ltd [2.4%]; Zhejiang Financial Development Co Ltd [1.0%]

Zhejiang Zhenhai-1 power station

The first two units of Zhejiang Zhenhai-1 power station, Units 1-2, were fired by petroleum and retired in 2003. Units 3-6 totaling 860 MW (4 x 215 MW) were brought online between 1985 and 1990. The plant is owned by Zhejiang Provincial Energy Group.[1]

Units 3-4 were retired in December 2018.[2]

Units 5-6 will be retired by the end of 2020.[3] The units were retired after Zhejiang Zhenhai-2 power station came online in December 2020.[4]

Zhejiang Zhenhai-2 power station

Zhejiang Energy Group is currently planning to build the two-unit coal-fired Zhejiang Zhenhai-2 power station, with a total planned capacity of 1,320 MW. [5]

Zhejiang Zhenhai-2 was permitted in August 2016.[5]

Construction began in January 2019. Once the new units are commissioned, Zhenhai-1 will be retired.[6]

Zhejiang Zhenhai-2 was commissioned in 2020.[4]

Plant Details for Zhejiang Zhenhai-2 power station

  • Sponsor: Zhejiang Zhenhai Power Generation Co
  • Parent company: Zhejiang Provincial Energy Group
  • Location: Niluoshan, Zhenhai District, Ningbo Prefecture, Zhejiang Province, China
  • Coordinates: 30.046415, 121.655241 (exact)
  • Status: Operating
  • Gross capacity: 1,320 MW (Units 1 & 2: 660 MW)
  • Type: Ultra-supercritical
  • Start year: 2020
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and Resources

References

  1. "浙江镇海发电有限责任公司," Baidu Baike, accessed November 2014
  2. "浙江浙能电力关于镇海电厂3、4号机组关停的公告," 北极星电力网, 2018/12/27
  3. 浙江:今年共有27台发电机组被列入淘汰目标(附清单) BJX News, 来源:浙江省发改委, 6/8/2020
  4. 4.0 4.1 "浙能镇电迁建项目1号机组正式投产". www.thehour.cn. 2020-10-23. Retrieved 2020-12-14.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 "浙能镇海电厂燃煤机组搬迁改造项目获核准," 国际电力网, 2016-08-08
  6. "中国能建浙江火电承建镇海电厂2号机组主体工程开工," 北极星电力网新闻中心, 2019/1/18